INSP-Final Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled, hydrostatic testing completed in conjunction with overhead hydrostatic tests done on 1/29/08 per documented activity under OH permit FIR07-00997.
|
INSP-Supply line flush | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Supply line flush | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | CANC |
Troy Cobbley
|
|
|
Gordon is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line is approved for cover.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 11/26/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/26/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/26/2007 | | 11/26/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/13/2006 | | 11/21/2007 | | PASS |
|
|
|
PLANS ARE APPROVED WITH BRYAN JOHNSON
|
Plan resubmittals received | | | 11/13/2007 | | |
|
|
|
received app. with (6) pages, & (5) sets of plans--plans put on fire shelf
|
Application received | | | 10/31/2007 | | |
|
|
|
|
Pending Assignment by SAM | 10/31/2007 | | | | |
|
|
|
|
Sprinkler Plan Check | 11/12/2007 | | | | FAIL |
|
|
|
These plans were denied due to lack of information and bury depth conflicting notes. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
|