Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/14/2008 | | 2/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/14/2008 | | DONE |
|
|
|
tlk to ben chavez ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/14/2008 | | |
|
|
|
|
Issue and Print Permit | | | 2/14/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/28/2008 | | 2/13/2008 | | PASS |
|
|
|
Note: This was the third review affecting 28 heads. These plans were originally approved in November of 2007. The piping plan was revised to include the addition of 5 heads in the eves. The plan modification also included new water flow information which resulted in a complete recalculation of the system hydraulics. A total of 28 heads were affected by the modification. Of those 28 heads, 23 were existing and 5 others added to the calculated area reviewed. Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 1/28/2008 | | |
|
|
|
received "2" fire spr apps, "3" fire submittal booklets, & "3" sets of plans -- plans put on fire shelf
|
INSP-Sprinkler Rough-in | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. However resubmittals are required due to additional heads and piping layouts in both of the remote areas.
|
Issue and Print Permit | | | 11/30/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/31/2007 | | 11/29/2007 | | |
|
|
|
These plans were denied. The designer failed to include the existing back flow device within the calculations as required.
Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days. Per Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/29/2007 | | 11/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2007 | | |
|
|
|
tlk to chavez ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/29/2007 | | |
|
|
|
|
Sprinkler Plan Check | 11/14/2007 | | 11/26/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Case Summary | | | 11/14/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/14/2007 | | |
|
|
|
Received application, and five copies of booklet of submittal info and pages FP1, FP2; taken to fire review
|
Application received | | | 10/31/2007 | | |
|
|
|
|
Case Summary | | | 10/31/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 10/31/2007 | | | | |
|
|
|
|