INSP-Final Inspection | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 1/2/2008 | 1/4/2008 | 1/4/2008 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications are approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 1/3/2008 | 1/3/2008 | 1/3/2008 | P | NR |
Forrest France
|
|
|
Inspection scheduled for 1/4 as indicated.
|
Issue and Print Permit | | | 11/13/2007 | | DONE |
|
|
|
|
Application received | | | 11/9/2007 | | |
|
|
|
|
Sprinkler Plan Check | 11/9/2007 | | 11/9/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/9/2007 | | 11/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2007 | | DONE |
|
|
|
left vm for brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/9/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 11/9/2007 | | | | |
|
|
|
|