INSP-Final Inspection | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Forrest France
|
|
|
See inspection comments per T. Frost.
|
INSP-Final Inspection | 2/17/2009 | 2/18/2009 | 2/18/2009 | A | PART |
Forrest France
|
|
|
Sprinkler system interconnections to the fire alarm panel for trouble, supervisory, and alarm conditions completed satisfactory.
|
INSP-Final Inspection | 2/16/2009 | 2/17/2009 | 2/17/2009 | A | PART |
Forrest France
|
|
|
Inspection request in conjunction with related fire alarm permit work for sprinkler system trouble, supervisory, and alarm monitoring.
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PART |
Forrest France
|
|
|
6th floor overhead hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/11/2009 | 2/12/2009 | P | DEFR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 2/11/2009 at 10:45:18 AM.
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2009 | 1/27/2009 | 1/27/2009 | P | PART |
Forrest France
|
|
|
Fire pump acceptance testing including rated and 150% flow tests and rooftop flow test completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | PART |
Forrest France
|
|
|
Okayed ceiling cover for heads and piping at the 3rd -7th floor common corridors, noticed several locations in condo units where light fixtures obstruct adjacent pendent heads-discussed with contractor.
|
INSP-Sprinkler Rough-in | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | PART |
Forrest France
|
|
|
Field verified resubmitted plans for changes at the 7th floor, noted corrections have been completed, see plans for annotations regarding today's inspection. Overhead install at the 7th floor okay for cover.
|
(F) Reprint permit | | | 12/5/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/5/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/21/2008 | | 12/4/2008 | | PASS |
|
|
|
plans are approved
|
Inspection Record Card- Fire | 12/4/2008 | | 12/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2008 | | DONE |
|
|
|
t/c w frank vigil at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/4/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/21/2008 | | DONE |
|
|
|
Received 3 transmittals sheets, 3 applications, 3 hydraulic design and 3 copies of sheets 7 of 8 put in fire box///dld
|
Sprinkler Plan Check | 11/12/2008 | | 11/19/2008 | | FAIL |
|
|
|
These plans were denied due to missing supporting calculations. Contact the P & D services to recover the d3nied set of plans for salvage.
Bryan Johnson
|
Plan resubmittals received | | | 11/12/2008 | | |
Scott Arellano
|
|
|
received plans & application
|
Plan resubmittals received | | | 10/21/2008 | | |
Sam Rogers
|
|
|
Plan mod, rec'd one transmittal letter, one application, one submittal packet, and one copy of sheets 1 through 8; taken to fire review
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | FAIL |
Forrest France
|
|
|
Inspection for the attic antifreeze system only. Field installation does not match approved plans at several locations including the design area, added heads, pipe routing, deleted heads, etc. Will need to provide approved resubmittals reflecting field modifications prior to cover. Also noted one unprotected cavity, a missing hanger, bushings at all branchline upright heads-circled locations on plans.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | FAIL |
Forrest France
|
|
|
SW heads at balconies must meet obstruction criteria or additonal coverage needs to be provided.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2008 | 9/11/2008 | 9/11/2008 | A | PART |
Forrest France
|
|
|
Antifreeze system piping and drops at the 7th floor exterior balcony soffits above the patio areas only approved for cover with the exception of two heads to be relocated at the SW and NW corners due to spacing issues as discussed.
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Forrest France
|
|
|
Rough-in at the dwelling units 3rd-6th floors only approved for cover, verified noted corrections have been completed for these areas.
|
INSP-Sprinkler Rough-in/Hydro | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Forrest France
|
|
|
Reviewed noted correction items from the previous inspection for deficiencies at the 3rd, 4th, 5th and 6th floor overhead rough-in for the dwelling units only. Corridor, elevator lobby, stairway landings, common areas are not complete at this time. Corrections per annotations on plans are finished with the exception of two missed locations-5th floor head spacing at the NW end unit, 4th floor sprinkler spacing at the NW end unit bedroom.
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | FAIL |
Forrest France
|
|
|
Overhead rough-in inspection for the 6th, 5th, 4th and 3rd floors failed due to items including hangers in need of adjustment, heads exceeding min. spacing guidelines, overspaced heads, "shadowing" at some areas, noted corridors not yet complete, both stair enclosures will require coverage due to combustible construction per NFPA 13 8.15.3.1. See plan set for annotations regarding corrections indicated. NOTE: Hydrostatic testing for the 6th and 4th floors passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing for the second, third and fifth floors passed. Noted minor spacing and hanger issues to be repaired on the 6th floor.
|
CHANGE STATUS TO (ISS) | | | 7/29/2008 | | DONE |
Tisha Gallop
|
|
|
Plan Modification/resubmittals received on 7/15/08 should have been submitted under FIR07-01042 not this permit per Sam Rogers.
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2008 | 7/14/2008 | 7/15/2008 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing completed acceptable for the dry system only, still need to complete 24 hr. air testing as discussed.
|
Plan resubmittals received | | | 7/15/2008 | | |
Sam Rogers
|
|
|
to relocate FDC and pump test header.
|
FIR-Aging Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 | | DONE |
Forrest France
|
|
|
Site visit confirmed construction underway, work in progress.
|
Issue permit | | | 3/19/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2008 | | DONE |
|
|
|
t/c w steve gaillard at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/7/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/7/2008 | | 3/7/2008 | | DONE |
Patricia Smith
|
|
|
|
Sprinkler Plan Check | 2/25/2008 | | 3/6/2008 | | PASS |
|
|
|
plans are approved w/conditions as submitted by bryan johnson
|
Application received | | | 11/13/2007 | | |
|
|
|
|
Pending Assignment by SAM | 11/13/2007 | | | | |
|
|
|
|
Plan assigned to (SAM) | 7/15/2008 | | | | |
Sam Rogers
|
|
|
|
Plan assigned to (SAM) | 10/21/2008 | | | | |
Sam Rogers
|
|
|
|