INSP-Final Inspection | 5/14/2009 | 5/15/2009 | 5/14/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | FAIL |
Troy Cobbley
|
|
|
The electric alarm bell has not been connected to the fire alarm panel. It has actually been connected to the forward flush control valve. When I operated the valve sparks flew from the junction box. Also the FDC is mounted below 18". Per the plans it was to be installed at 30". Need to perform forward flush as well.
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test and flush passed
|
INSP-Sprinkler Rough-in | 4/15/2008 | 4/15/2008 | 4/16/2008 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground is ok to cover
|
INSP-Sprinkler Rough-in | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PASS |
Troy Cobbley
|
|
|
The underground stub out is ok to cover. The remaining underground piping needs to be inspected when installed.
|
Sprinkler Plan Check | 12/3/2007 | | 12/3/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2007 | | DONE |
Scott Arellano
|
|
|
|
Inspection Record Card- Fire | 12/3/2007 | | 12/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2007 | | DONE |
|
|
|
tlk to jeff anderson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/3/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/3/2007 | | DONE |
|
|
|
|
Application received | | | 11/30/2007 | | |
|
|
|
|
Pending Assignment by SAM | 11/30/2007 | | | | |
|
|
|
|