Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00971
StatusFinaled
Name FIRE SENTRY SYSTEMS
Site Address 512 N 8TH ST
Project NameST MICHAEL'S
Customer Number 
ePlanReview 
Description
6/1/09 PLAN MODIFICATION: This Plan modification is to implement field changes and review comments. Changes include to add/remove/relocate notification devices, add duct detector, add a smoke detector, and sprinkler system monitoring devices.
_____________________________________________________________________________________________________________________________
This fire alarm permit is to replace an existing fire alarm panel and install a new addressable system at the St Michaels Cathedral Episcopal Church Bishop Tuttle House and Funsten House Buildings. The new system is show to include a basement, 1st floor, mezzanine and 2nd floor manual fire alarm system with required notification appliances, fire sprinkler and kitchen hood monitoring, elevator recall, shunt trip and power monitoring and remote annunciator. Building permit BLD07-01784 Includes the following; Bishop Tuttle House and the Funsten House will be fire sprinklered for story increase and for code trade-offs. To remodel the 3,424 square foot basement and 3,616 square foot 1st story of the Bishop Tuttle House of St. Michael's Episcopal Church. A 950 square foot 1st story mezzanine addition will also be constructed. Work is to include 2 restrooms accessible to the disabled, an elevator shaft, an elevator, interior nonbearing walls, suspended ceilings, a stairway to the new mezzanine, and finishes. The Bishop Tuttle House and the Funsten house will be fully fire sprinklered in conjunction with this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The combination of parcels must be completed before this permit is finaled. DRH07-00182 (see also DRH01-00010 and CUP01-00002) **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  7/17/2009 DONE
Taken to records for scanning.
INSP-Final Inspection6/29/20096/30/20096/30/2009PPASS
DetailsForrest France
Correction notice items verified for completion, final site fire alarm testing passed, permit finaled.
INSP-Final Inspection6/18/20096/19/20096/22/2009PPART
DetailsForrest France
See inspection comments 6/22.
INSP-Final Inspection6/19/20096/22/20096/22/2009PPART
DetailsForrest France
Items needed for final include adjustment at the PIV tamper switch, program door holds at two locations to release on general alarm conditon, elevator recall functions did not operate correctly. Remainder of installation passed field testing.
INSP-Final Inspection6/17/20096/17/20096/17/2009PPART
DetailsForrest France
Missing current set of approved plans on site for inspection as requested.
INSP-Final Inspection6/15/20096/16/20096/16/2009PCANC
DetailsForrest France
ryan - after 2 please Phone #: ###-#### Rescheduled per conversation with contractor.
INSP-Final Inspection6/11/20096/12/20096/12/2009PCANC
DetailsTroy Cobbley
Cancelled per Forrest. To be rescheduled for next week.
CHANGE STATUS TO (ISS)  6/3/2009 DONE
(F) Reprint permit  6/3/2009 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  6/2/2009 DONE
Inspection Record Card- Fire6/2/2009 6/2/2009 DONE
DetailsBarbara Stitt
Telephone call  6/2/2009 DONE
Left message that permit is ready for pick up///6-2-09 @ 8:05am BAS
Plan assigned to (Stephanie)5/28/2009 6/1/2009 DONE
DetailsStephanie L. Cobbley
6/1/2009 15:52:11 SLC - activity updated through activity FIRA24 from case FIR07-00971.
Alarm Plan Check6/1/2009 6/1/2009 PASS
DetailsStephanie L. Cobbley
See redlines and review comments
PLANS TAKEN FRONT DESK ALARM  6/1/2009 DONE
Approved redlined plans available at front counter
Plan resubmittals received  5/28/2009 DONE
DetailsAlexandra L. DeYoung
Plan Mod rec'd- one copy of app and submittal info
INSP-Alarm Testing5/8/20095/11/20095/13/2009PFAIL
DetailsForrest France
Need to provide NFPA 72 record of inspection and testing including a signals list prior to final on site acceptance test, missing building map at the FACP for device and zone locations, field installation does not match approved plans including sprinkler risers, deleted/added devices, etc., plan resubmittals are necessary to reflect changes, noted some minor field adjustments to be made for spacing of notification devices.
INSP-Alarm Testing5/6/20095/7/20095/7/2009PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 5/6/2009 at 12:19:58 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 7 2009 10:32AM.
INSP-Alarm Testing4/27/20094/30/20094/29/2009PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 4/27/2009 at 4:00:14 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 29 2009 1:32PM.
INSP-Alarm Testing4/23/20094/27/20094/27/2009PNR
DetailsForrest France
Scheduled by a contractor via Hello! on 4/23/2009 at 10:21:08 AM. Contact: ###-####. Contractor not available for site inspection per phone conversation.
INSP-Final Inspection2/18/20092/19/20092/19/2009ADEFR
DetailsForrest France
Casey- call 30 mins prior to going Phone #: ###-#### * NOTE * Wrong permit number requested by contractor-Intended for project related fire sprinkler work.
INSP-Final Inspection2/17/20092/18/20092/18/2009ACANC
DetailsForrest France
Jerry- call 30 mins prior to going Phone #: ###-####
Telephone call  7/21/2008 DONE
Spoke with John at Fire Sentry who stated one part of the building is close to being completed, however work still continues on the Funston site of the building.
Telephone call  7/17/2008 DONE
Left a message asking for the status
INSP-Conference3/31/20084/1/20084/1/2008PCANC
DetailsForrest France
Wrong permit called in for conference.Will call in correct permit.KR
Issue and Print Permit  1/3/2008 DONE
Plan assigned to (Mike)12/27/2007 12/28/2007 PASS
12/28/2007 13:30:20 MWT - activity updated through activity FIRA22 from case FIR07-00971.
Alarm Plan Check12/28/2007 12/28/2007 PASS
DetailsMichael Timmerman
Fire Alarm Review 2nd
PLANS/APPL TAKEN TO FRONT DESK  12/28/2007 DONE
Ready for Issue
Inspection Record Card- Fire12/28/2007 12/28/2007 DONE
Telephone call  12/28/2007 DONE
lft ms for john lopez ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  12/28/2007 DONE
Plan resubmittals received  12/27/2007  
received "3" sets of plans & the app
Issue and Print Permit  12/6/2007 DONE
issued by mistake
Plan assigned to (Mike)12/6/2007 12/6/2007 DONE
change status back to review, issued by mistake
Miscellaneous action  12/6/2007 DONE
picked up failed plans, resubmittals required
Alarm Plan Check12/5/2007 12/5/2007 FAIL
DetailsMichael Timmerman
Fire Alarm Review 1st
Telephone call  12/5/2007 DONE
left message w jimmy for john lopez at ###-#### - permit needs to be picked up and resubmitted
Application received  11/30/2007  
Case Summary  11/30/2007 DONE