INSP-Final Inspection | 1/10/2008 | 1/11/2008 | 1/11/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Supply line flush | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | FAIL |
Forrest France
|
|
|
No water supply available to complete flushing as required.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2007 | 12/18/2007 | 12/18/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/12/2007 | 12/13/2007 | 12/13/2007 | A | FAIL |
Forrest France
|
|
|
UG hydrostatic test failed due to a 5 psi. loss at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | CANC |
Forrest France
|
|
|
bryan - underground Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line approved for cover.
|
Inspection Record Card- Fire | 12/5/2007 | | 12/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2007 | | |
|
|
|
tlk to jeff anderson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/5/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/5/2007 | | DONE |
|
|
|
|
Application received | | | 12/4/2007 | | |
|
|
|
|
Sprinkler Plan Check | 12/4/2007 | | 12/4/2007 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 12/4/2007 | | | | |
|
|
|
|