INSP-Final Inspection | 2/8/2008 | 2/8/2008 | 2/8/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PART |
Forrest France
|
|
|
OH system modifications are approved for cover at the drop ceilings.
|
Issue and Print Permit | | | 12/17/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/10/2007 | | 12/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/10/2007 | | DONE |
|
|
|
t/c w tom dutkus at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/10/2007 | | DONE |
|
|
|
|
Application received | | | 12/10/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2007 | | |
Kenneth R Roule
|
|
|
|
Telephone call | | | 12/10/2007 | | |
Kenneth R Roule
|
|
|
Called Tom with Idaho fire protection and let him know we need drawings in 1/8" scale..
|
Sprinkler Plan Check | 12/10/2007 | | | | PASS |
Kenneth R Roule
|
|
|
|
Pending Assignment by SAM | 12/10/2007 | | | | |
|
|
|
|