Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00997
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3423 S FEDERAL WAY
Project NameRoss Dress for Less
Customer Number 
ePlanReview 
Description
The Permitted Work Scope: Overhead Only
Beginning from an existing 6” underground supply spigot in the riser room, install a 4 manifold and wet riser to serve through out the interior of the store. The exterior will be severed from an auxiliary anti freeze system. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to permit BLD07-01188 and UG permit # FIR07-00897.04/29/08 Revised Work Scope: Overhead Only
The contractor added 38 additional pendant heads between the light soffits and the wall on all four sides of the bldg to meet coverage requirements. The modification was noted as Delta 2 & 2A, dated 04/18/08. This modification does not appear to adversely affect the operation of the system as designed.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/24/20086/24/20086/24/2008PPASS
DetailsForrest France
Correction notice items verified for completion, OH fire sprinkler permit finaled.
INSP-Final Inspection6/20/20086/23/20086/23/2008AFAIL
DetailsForrest France
Provide certification for the RPB, relocate the automatic ball drip for the fire dept. connection, provide missing "911" sign at the outside bell, provide pitot and playpipe for functional forward flow testing per review notes, need to attatch calc stickers, riser signage, state tag etc.
INSP-Sprinkler Rough-in/Hydro5/22/20085/23/20085/23/2008APART
DetailsForrest France
Hydrostatic testing for the new system piping branch lines and pendent heads passed.
INSP-Sprinkler Rough-in5/20/20085/21/20085/22/2008APART
DetailsForrest France
System modifications per plan resubmittals completed okay, will need a hydrostatic test for the new heads and piping, noted missing ball drip at the FDC, also discussed items needed for final including forward flow test, alarm interconnections, etc.
Plan assigned to (SAM)4/23/2008 5/1/2008 PASS
DetailsCathy Brown
5/1/2008 10:44:44 CMB - activity updated through activity FIRA22 from case FIR07-00997.
PLANS/APPL TAKEN TO FRONT DESK  5/1/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire5/1/2008 5/1/2008 DONE
DetailsCathy Brown
Telephone call  5/1/2008 DONE
DetailsCathy Brown
tlk to lillie ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  5/1/2008 DONE
DetailsCathy Brown
Issue and Print Permit  5/1/2008 DONE
Sprinkler Plan Check4/23/2008 4/29/2008 PASS
Details
As-Built Plans are Approved By Bryan Johnson
Plan resubmittals received  4/23/2008  
plan modification: received five copies of application, submittal packet and sheets FP1, FP2; taken to fire review
INSP-Conference3/14/20083/18/20083/18/2008ADONE
DetailsForrest France
On site visit regarding the requirement for extended coverage pendent sprinklers at the sales floor area to meet NFPA 13 2002 table 8.8.5.1.2(a) to avoid obstructions to discharge.
INSP-Sprinkler Rough-in3/3/20083/4/20083/4/2008PFAIL
DetailsForrest France
Overspaced head at the restroom area, EC heads adjacent to the south and west walls of the sales floor area do not meet table 8.8.5.1.2 per NFPA 13 for clearance to ceiling mounted obstructions.
INSP-Sprinkler Rough-in/Hydro1/28/20081/29/20081/29/2008PPART
DetailsForrest France
Hydrostatic tests for the overhead wet and antifreeze systems as well as the underground supply piping passed.
INSP-Final Inspection1/24/20081/25/20081/25/2008APART
DetailsForrest France
Overhead rough-in inspection only, noted one missing ret. strap, one missing hanger, two overspaced heads at the hard lid ceiling restroom areas, the antifreeze loop piping is not yet tied in to the riser, riser not complete at this time, see approved plan set for annotations, hydrostatic testing not ready due to start pressure well below 200psi., remainder of OH rough-in is acceptable.
INSP-Conference1/23/20081/24/20081/24/2008ADONE
DetailsForrest France
On site conference with regard to location of the FDC.
PLANS/APPL TAKEN TO FRONT DESK  1/18/2008 DONE
Telephone call  1/18/2008 DONE
tlk to lilly ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire1/18/2008 1/18/2008 DONE
DetailsCathy Brown
Permit Ready to Issue  1/18/2008 DONE
Issue and Print Permit  1/18/2008 DONE
Sprinkler Plan Check1/7/2008 1/17/2008 PASS
Details
Plans are approved by Bryan Johnson
Application received  12/12/2007  
Pending Assignment by SAM12/12/2007    
Sprinkler Plan Check12/26/2007   FAIL
These plans were rejected due to lack of information. Upon request the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for five working days