Case Summary | | | 10/20/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/10/2008 | 6/11/2008 | 6/11/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 5/30/2008 | 6/2/2008 | 6/2/2008 | P | CANC |
Troy Cobbley
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Telephone call | | | 3/13/2008 | | DONE |
|
|
|
left message w allie for matt casey at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/13/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/13/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 3/12/2008 | | 3/12/2008 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Mike) | 12/12/2007 | | 2/4/2008 | | PASS |
Cathy Brown
|
|
|
2/4/2008 10:09:09 CMB - activity updated through activity FIRA22 from case FIR08-00015.
|
Meeting | | | 1/29/2008 | | DONE |
|
|
|
Walk-in meting requested by architect Dave Davies to discuss a request for approval to install mag locks on three 80" exit doors, which would obstruct the opening height by 3 inches; no alternative was proposed for obstructing the required opening height. I indicated that would not be an acceptable obstruction and he agreed to use another model which mounts of the exterior and does not obstruct the existing 80" clear opening. We reviewed IBC 1008.1.8.6 I requirements. I also advised him to promptly advise the FA Engineer, who is about to approve the alarm shop drawings. Ihe PE will need to modify his FA design, resubmit it to the FA vendor who will change the shop drawings, then route them back to the PE for approval and then resubmit them to us, before we issue the fire alarm plans. Dave agreed to do so.
|
Telephone call | | | 1/7/2008 | | DONE |
|
|
|
Called Guardian Alarms - left Msg that I need notification appliance circuit current totals, how they were derived. Don't match with what data sheets say.
|
Miscellaneous action | | | 1/7/2008 | | DONE |
|
|
|
Plan review completed holding until engineers review complete.
|
Alarm Plan Check | 1/4/2008 | | 1/7/2008 | | PEND |
Michael Timmerman
|
|
|
Fire Alarm Review 2nd
|
Telephone call | | | 1/4/2008 | | DONE |
|
|
|
Called Matt Casey Fire Alarm Applicant. Told Matt that we require a letter of review from the design engineer of the shop drawings. I him know we need this letter before I issue the resubmitted plan. (This requirement was stated in the 1st review)
|
Miscellaneous action | | | 1/4/2008 | | DONE |
|
|
|
Received a phone call from fire alarm vendor checking on status of resubmittals. Permit Fir07-00998 and Fir07-00999 were logged in as the same project. Corrected by Mike Timmerman
|
Plan resubmittals received | | | 1/3/2008 | | DONE |
|
|
|
received 6 copies of sheets FA1,FA2,FA3,FA4 and 2 applications dent to fire///dld
|
Alarm Plan Check | 12/13/2007 | | 12/13/2007 | | FAIL |
Michael Timmerman
|
|
|
Fire Alarm Review 1st
|
Miscellaneous action | | | 12/13/2007 | | DONE |
|
|
|
Faxed Copy of Failed Plan Review to Matt Casey ###-#### and Engineer Jon Van Stone ###-####
|
Telephone call | | | 12/13/2007 | | DONE |
|
|
|
lft vm with matt casey ###-#### that permit has to resubmittal required on both sets
|
Case Summary | | | 12/12/2007 | | |
|
|
|
|
Application received | | | 12/12/2007 | | |
|
|
|
|