Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR07-01005
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project Name 
Customer Number 
ePlanReview 
Description
The Permitted Work Scope: Over Head Only
Modify the existing system by adding 71 QR heads to accommodate a new ceiling layout. The existing standard response heads throughout the 257,200-ft/2 facility with exception of the atrium, will be changed out to Quick Response type heads. Fourteen hundred heads will be affected out side of the construction area of 17,460-ft/2 permitted due to this part of the scope. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02967.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. 4/18/08-SCOPE MODIFICATION: The "plan approval" done in conjunction with this permit includes the replacement of existing standard response sprinklers with QR sprinklers as stated above, however the "scope" of this permit is modified so this "permit" will apply only to the work to be completed within the area associated with TI permit BLD07-02967, i.e. 71 sprinkler heads involved. The installation of QR heads throughout the remainder of the building will occur as TI work is done in 12 separate "phases", each under a separate building (BLD) permit, over the next 2-3 months. Separate FIR permit applications will be submitted by TVFP for sprinkler modifications to be made in conjunction with the TI work to be done under each of those building permits. SLR
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/11/2009 DONE
Sent for archiving
FIR-Aging Inspection1/27/20091/27/20091/27/2009PDONE
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection1/26/20091/26/20091/27/2009PPASS
DetailsForrest France
Noted corrections verified for completion, fire sprinkler permit finaled.
INSP-Final Inspection1/22/20091/23/20091/26/2009PPART
DetailsForrest France
Hydrostatic testing for each system at all four building risers completed satisfactory, final walkthrough also completed for head change-out. Discovered 5 remaining heads to be changed at the mens locker room area 1st floor, missing ceiling tiles at the offices behind the front reception counter, and two missing escutcheons (installed while on site). NOTE: Site inspection completed on Sat. 1/24/09 per request.
INSP-Sprinkler Rough-in/Hydro1/26/20091/26/20091/26/2009ADONE
DetailsForrest France
Duplicate inspection
INSP-Conference1/13/20091/13/20091/13/2009PDONE
DetailsForrest France
Regarding after hours site inspection request.
INSP-Sprinkler Rough-in/Hydro11/7/200811/10/200811/10/2008ACANC
DetailsTroy Cobbley
raul - late morning Phone #: ###-####
CHANGE STATUS TO (ISS)  4/22/2008 DONE
Per Jim Storey as scope of work not completed
Telephone call  4/22/2008 DONE
4/22/08-Telcon with TVFP (Brodie and Ron Stenquist) and Jim Storey regarding how to track replacement of additional 1400 heads in remainder of building as specified in the scope of this permit. This permit cannot be finaled until all heads have been replaced. Jim and Ron are going request the architect to provide a copy of the floor plan of the entire building with all spaces shown as will exist after all phases are completed, which TVFP will use to progressively identify those areas where the sprinklers have been changed and the fire inspector will initial those areas as inspections are completed, until finally all areas will be shown to be completed, by the end of all phase work. This permit is to be returned to Issued status and remain in the ISS status until all sprinkler replacement work has been completed and the final "Phased" building permit is not to be finaled until this sprinkler permit has been "finaled".
INSP-Final Inspection1/31/20081/31/20081/31/2008PPASS
DetailsForrest France
Permit work is complete, c/n item has been done, fire sprinkler permit finaled.
INSP-Sprinkler Rough-in1/9/20081/10/20081/10/2008APART
DetailsForrest France
See areas on approved plans okayed for cover at the drop ceilings, noted one head to be added as red-lined due to a column obstruction-can be verified at final insp.
Issue and Print Permit  1/2/2008  
PLANS/APPL TAKEN TO FRONT DESK  12/31/2007 DONE
Telephone call  12/31/2007 DONE
lft wm with brodie ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire12/31/2007 12/31/2007 DONE
DetailsCathy Brown
Permit Ready to Issue  12/31/2007 DONE
Sprinkler Plan Check12/13/2007 12/28/2007 PASS
Details
Plans approved as submitted by Bryan Johnson
Case Summary  12/13/2007  
Application received  12/13/2007  
Pending Assignment by SAM12/13/2007