Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
FIR-Aging Inspection | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | DONE |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/26/2009 | 1/26/2009 | 1/27/2009 | P | PASS |
Forrest France
|
|
|
Noted corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/22/2009 | 1/23/2009 | 1/26/2009 | P | PART |
Forrest France
|
|
|
Hydrostatic testing for each system at all four building risers completed satisfactory, final walkthrough also completed for head change-out. Discovered 5 remaining heads to be changed at the mens locker room area 1st floor, missing ceiling tiles at the offices behind the front reception counter, and two missing escutcheons (installed while on site). NOTE: Site inspection completed on Sat. 1/24/09 per request.
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2009 | 1/26/2009 | 1/26/2009 | A | DONE |
Forrest France
|
|
|
Duplicate inspection
|
INSP-Conference | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | DONE |
Forrest France
|
|
|
Regarding after hours site inspection request.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2008 | 11/10/2008 | 11/10/2008 | A | CANC |
Troy Cobbley
|
|
|
raul - late morning Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/22/2008 | | DONE |
|
|
|
Per Jim Storey as scope of work not completed
|
Telephone call | | | 4/22/2008 | | DONE |
|
|
|
4/22/08-Telcon with TVFP (Brodie and Ron Stenquist) and Jim Storey regarding how to track replacement of additional 1400 heads in remainder of building as specified in the scope of this permit. This permit cannot be finaled until all heads have been replaced. Jim and Ron are going request the architect to provide a copy of the floor plan of the entire building with all spaces shown as will exist after all phases are completed, which TVFP will use to progressively identify those areas where the sprinklers have been changed and the fire inspector will initial those areas as inspections are completed, until finally all areas will be shown to be completed, by the end of all phase work. This permit is to be returned to Issued status and remain in the ISS status until all sprinkler replacement work has been completed and the final "Phased" building permit is not to be finaled until this sprinkler permit has been "finaled".
|
INSP-Final Inspection | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Forrest France
|
|
|
Permit work is complete, c/n item has been done, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 1/9/2008 | 1/10/2008 | 1/10/2008 | A | PART |
Forrest France
|
|
|
See areas on approved plans okayed for cover at the drop ceilings, noted one head to be added as red-lined due to a column obstruction-can be verified at final insp.
|
Issue and Print Permit | | | 1/2/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/31/2007 | | DONE |
|
|
|
lft wm with brodie ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 12/31/2007 | | 12/31/2007 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 12/31/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/13/2007 | | 12/28/2007 | | PASS |
|
|
|
Plans approved as submitted by Bryan Johnson
|
Case Summary | | | 12/13/2007 | | |
|
|
|
|
Application received | | | 12/13/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/13/2007 | | | | |
|
|
|
|