Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-01030
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1620 W RIVER ST
Project NameINTERFAITH SANCTUARY
Customer Number 
ePlanReview 
Description
PHASE 2 - Limited Scope: to install the overhead throughout the remaining half of the building but does NOT include installation of the underground main and water connection. The overhead system will remain a dry pipe, manual system per approval of the fire chelf, Renn Ross and Fire Marshal Dave Hanneman. The water connection and riser are still expected to be installed in Feb/Mar when grant funds become available, and that work will be done under a Phase 3 permit. Phase 1 and Phase 2 pemits will remain in the PART approved status until the complete system is finaled under Phase 3. These Phase 2 plans are approved for installation, but as with Phase 1, will not be officially "ISSUED", since this is still a partial system installation.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/3/2009 DONE
finaled by tim frost
INSP-Sprinkler Rough-in/Hydro12/20/200712/21/200712/21/2007PPART
DetailsForrest France
Verified OH hydrostatic test, noted coverage obstruction at one location, need to provide relief valve at the riser due to the grid system design.
Application received  12/20/2007  
Sprinkler Plan Check12/19/2007 12/20/2007 PART
Plans received to install the overhead throught the remaining half of the building but NOT include installation of the underground main and water connection. The overhead system will remain a dry pipe, manual system per approval of the fire chelf, Renn Ross and Fire Marshal Dave Hanneman. The water connection and riser are still expected to be installed in Feb/Mar when grant funds become available, and that work will be done under a Phase 3 permit. Phase 1 and Phase 2 pemits will remain in the PART approved status until the complete system is finaled under Phase 3. These Phase 2 plans are approved for installation, but as with Phase 1, will not be officially "ISSUED", since this is still a partial system installation. @00F heads approved instead of 155 F heads used in Phase 1, due to contractor's concern for higher temp's at roof deck level.
Miscellaneous action  12/19/2007 DONE
Early Start Approval granted, based on telcon requrest from Ron Larson, Viking Sprinkler, due to the expedited nature of this work, so as to have the system installed and approved for temporary occuancy prior to Christmas.
Pending Assignment by SAM12/20/2007