DOC - Permit Finaled | | | 3/18/2008 | | DONE |
|
|
|
permit finaled on 1/30/08
|
INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/29/2008 | 1/30/2008 | 1/30/2008 | A | PASS |
Forrest France
|
|
|
System main tie-in verified for completion, old branch lines and head demo at the permit work area is also complete.
|
INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 1/29/2008 at 2:29:37 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2008 | 1/23/2008 | 1/23/2008 | P | PART |
Forrest France
|
|
|
Completed overhead hydrostatic testing, inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PART |
Forrest France
|
|
|
Overhead rough-in of the new system mains and branch lines is satisfactory, tie in pending hydro test completion, work in progress for demo of the old system piping and heads currently underway.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 1/8/2008 | | 1/8/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/8/2008 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/8/2008 | | |
|
|
|
|
Issue and Print Permit | | | 1/8/2008 | | |
|
|
|
|
Sprinkler Plan Check | 12/21/2007 | | 1/7/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 12/21/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/21/2007 | | | | |
|
|
|
|