INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | FAIL |
Forrest France
|
|
|
Need to provide matched response heads at the mill/lathe and lab room areas.
|
INSP-Sprinkler Rough-in | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. No pendant heads/arm-overs have been installed on the drop piping in the larger area. Hangers have been installed at the deck in this location.
|
Sprinkler Plan Check | 1/2/2008 | | 1/2/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/2/2008 | | 1/2/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/2/2008 | | DONE |
|
|
|
t/c w jim heiller at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/2/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/2/2008 | | |
|
|
|
|
Application received | | | 12/27/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/27/2007 | | | | |
|
|
|
|