Case Summary | | | 12/12/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 5/14/2008 | 5/14/2008 | 5/14/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Sprinkler Rough-in | 2/1/2008 | 2/1/2008 | 2/1/2008 | P | PASS |
Troy Cobbley
|
|
|
The fire sprinkler contractor received approvals from Brian Johnson for the revised pipe sizes. The sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 1/24/2008 | 1/28/2008 | 1/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The piping installation is acceptable but the second floor pipe size does not match plans. I spoke to John Edes and let him know that the pipe size will need to be approved by Brian Johnson prior to cover permission being given. No piping can be covered at this point.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/16/2008 | | 1/16/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/16/2008 | | DONE |
|
|
|
LFT VM WITH JOHN EDES ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP
|
Permit Ready to Issue | | | 1/16/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/16/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/27/2007 | | 1/14/2008 | | PASS |
|
|
|
Please Note: These plans were not submitted per the described scope with in the bld permit # bld07-02682 - Plans are approved by Bryan Johnson
|
Application received | | | 12/27/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/27/2007 | | | | |
|
|
|
|