INSP-Final Inspection | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, remainder of escutcheons and ceiling tile installed while on site.
|
INSP-Sprinkler Rough-in | 2/19/2008 | 2/19/2008 | 2/19/2008 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications are approved for cover at the drop ceilings.
|
Issue and Print Permit | | | 1/15/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/28/2007 | | 1/14/2008 | | PASS |
|
|
|
Quick Permit by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/14/2008 | | 1/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/14/2008 | | |
|
|
|
tlk to ben chavez ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/14/2008 | | |
|
|
|
|
Telephone call | | | 1/11/2008 | | DONE |
|
|
|
Ben Chavez called to check on status of quick permit sprinkler review for this project. This plan was inadvertantly picked up by the contracted fire sprinkler plan reviewer, Johnson Consulting. Contacted Johnson Consulting and confirmend that this project needs to be expedited ASAP, as it is a quick permit.
|
Case Summary | | | 12/28/2007 | | DONE |
|
|
|
|
Application received | | | 12/28/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/28/2007 | | | | |
|
|
|
|