INSP-Final Inspection | 2/19/2008 | 2/19/2008 | 2/19/2008 | P | PASS |
Forrest France
|
|
|
Corrections are finished, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | PART |
Forrest France
|
|
|
Verified corrections noted at the previous inspection are compliant, overhead modifications are approved for cover at the drop ceilings, discussed need for a current annual inspection to be provided for the existing fire sprinkler system prior to building permit final.
|
INSP-Sprinkler Rough-in | 2/12/2008 | 2/12/2008 | 2/13/2008 | P | DEFR |
Forrest France
|
|
|
Duplicate inspection request.
|
INSP-Sprinkler Rough-in | 2/8/2008 | 2/8/2008 | 2/8/2008 | P | FAIL |
Troy Cobbley
|
|
|
Additional upright sprinkler protection is required in the combustible concealed space due to the new duct work obstructing the spray of the existing upright fire sprinklers. Also the existing riser needs to have a current inspection.
|
Issue and Print Permit | | | 1/15/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/14/2008 | | 1/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/14/2008 | | DONE |
|
|
|
lft ms with secretary ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2008 | | DONE |
|
|
|
Ben Chavez called to check on status of quick permit sprinkler review for this project. This plan was inadvertantly picked up by the contracted fire sprinkler plan reviewer, Johnson Consulting. Contacted Johnson Consulting and confirmend that this project needs to be expedited ASAP, as it is a quick permit.
|
Case Summary | | | 12/31/2007 | | DONE |
|
|
|
|
Application received | | | 12/31/2007 | | |
|
|
|
|
Pending Assignment by SAM | 12/31/2007 | | | | |
|
|
|
|