INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | A | PASS |
Forrest France
|
|
|
Field modifications are acceptable, as-built plans accepted.
|
INSP-Final Inspection | 1/28/2008 | 1/29/2008 | 1/29/2008 | A | PART |
Forrest France
|
|
|
Work is acceptable pending two copies of as-built plans are provided reflecting the actual installation.
|
Issue and Print Permit | | | 1/14/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/10/2008 | | 1/10/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/10/2008 | | DONE |
|
|
|
lft vm with jim danes ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/10/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/7/2008 | | 1/8/2008 | | PASS |
|
|
|
|
Case Summary | | | 1/7/2008 | | DONE |
|
|
|
|
Application received | | | 1/7/2008 | | |
|
|
|
|
Pending Assignment by SAM | 1/7/2008 | | | | |
|
|
|
|