Permit Information
Permit NumberFIR08-00014
StatusFinaled
Name ADT SECURITY SERVICES INC
Site Address 500 S MARDEN LN
Project NameUNITED WATER TREATMENT PLANT
Customer Number 
ePlanReview 
Description
This fire alarm permit is to install a new fire alarm panel. The existing fire alarm system was found to be to limited size and not capable of releasing functions for a new double interlock pre-action sprinklers system the owner is having installed. The new system will include a new FACP audible visual notification appliances installed in common use areas, selective smoke detection in the electrical room 128, smoke detection for double interlock preaction sprinkler system main entry manual pull station and annunciator. This permit is associated with Fire Sprinkler Permit FIR07-00575. No building permit is associated with this work.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  12/9/2008  
Miscellaneous action  6/4/2008 DONE
Plans taken to records to scan
INSP-Final Inspection3/13/20083/14/20083/14/2008APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection3/10/20083/12/20083/12/2008PFAIL
DetailsTroy Cobbley
Provide monitor module for the existing duct smoke detector and relocate the new duct smoke detector to the return side of the hvac unit. Location is marked on the plans. Also provide the monitoring station test reports for review.
Issue and Print Permit  1/25/2008 DONE
Plan assigned to (Mike)1/7/2008 1/18/2008 PASS
DetailsMichael Timmerman
1/18/2008 10:40:11 MWT - activity updated through activity FIRA22 from case FIR08-00014.
PLANS/APPL TAKEN TO FRONT DESK  1/18/2008 DONE
Ready for Issue
Miscellaneous action  1/18/2008 DONE
Received Revised Battery Calculations from ADT via Fax. Plans Issued.
Inspection Record Card- Fire1/18/2008 1/18/2008 DONE
DetailsPatricia Smith
Telephone call  1/18/2008 DONE
t/c w dave whiting at ###-#### - permit ready and fees given
Permit Ready to Issue  1/18/2008 DONE
Alarm Plan Check1/14/2008 1/14/2008 PASS
DetailsMichael Timmerman
Fire Alarm Review 1st - Revised Battery Calculations Received VIA Fax 1-16-2008 Permit Issued
Telephone call  1/14/2008 DONE
Called Dave Whiting at ADT, told Dave that battery calculations did not add up and I need how he derived his NAC alarm current. Told Dave I would hold plans in pending waiting for information for 24hrs.
Case Summary  1/7/2008  
Application received  1/7/2008