INSP-Final Inspection | 7/23/2008 | 7/23/2008 | 7/23/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground piping up to the tank pad is ok to cover.
|
INSP-Sprinkler Rough-in | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PASS |
Troy Cobbley
|
|
|
One more lenght of pipe beyond the power pole was installed for this inspecton and is ok to cover.
|
INSP-Sprinkler Rough-in | 2/19/2008 | 2/19/2008 | 2/19/2008 | P | PASS |
Troy Cobbley
|
|
|
The thrust block is ok to bury.
|
INSP-Sprinkler Rough-in | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground piping from the stubout to the power pole is ok to cover except for the 22 degree fitting which will need a thrust block.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2008 | | 2/8/2008 | | DONE |
Cathy Brown
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 2/8/2008 | | 2/8/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/8/2008 | | |
|
|
|
lft vm with christopher wilson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/8/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/8/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/6/2008 | | 2/7/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Sprinkler Plan Check | 2/6/2008 | | 2/7/2008 | | PASS |
|
|
|
Plan are approved by Bryan Johnson
|
Plan resubmittals received | | | 2/6/2008 | | |
|
|
|
received "5" sets of plans and the fire spr app & letter of transmittal- plans put on fire shelf
|
INSP-Sprinkler Rough-in | 1/15/2008 | 1/15/2008 | 1/15/2008 | P | PASS |
Troy Cobbley
|
|
|
The 5' stub out is ok to cover.
|
Sprinkler Plan Check | 1/14/2008 | | 1/14/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/14/2008 | | 1/14/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/14/2008 | | DONE |
|
|
|
t/c w jeff anderson - permit ready and fees given
|
Permit Ready to Issue | | | 1/14/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/14/2008 | | DONE |
|
|
|
|
Application received | | | 1/10/2008 | | |
|
|
|
|
Pending Assignment by SAM | 1/10/2008 | | | | |
|
|
|
|