Permit NumberFIR08-00036
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 9272 PIERCE PARK RD
Project NamePIERCE PARK HORSE ARENA
Customer Number 
ePlanReview 
Description
Scope of Work: OH Only - Beginning from an existing 6” stub in located in the riser room, install an 8” dry riser and dry pipe system to serve though out the arena. The sprinkler system will be gravity fed / supplied from a new 50,000 gallon supply tank installed by others in accordance with NFPA 22. The tank installation and plans were approved separately from this plan review. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD07-02354 & UG permit FIR08-00026.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/22/20087/22/20087/22/2008PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection7/18/20087/18/20087/18/2008PFAIL
DetailsTroy Cobbley
Provide locks and/or chains for both of the PIV's and I need verification that the intake pipe in the new storage tank is at the correct height.
INSP-Sprinkler Rough-in/Hydro7/16/20087/17/20087/17/2008PPASS
DetailsTroy Cobbley
The underground hydro test passed and the underground flush passed.
CHANGE STATUS TO (ISS)  7/8/2008 DONE
Plan resubmittals received  6/17/2008  
DetailsStacey Carlson
INSP-Sprinkler Rough-in/Hydro5/7/20085/8/20085/8/2008APASS
DetailsTroy Cobbley
24 hour air test passed
INSP-Sprinkler Rough-in/Hydro5/6/20085/7/20085/7/2008APART
DetailsTroy Cobbley
24 hour air test started at 8:30am with 45 psi on the guage.
INSP-Sprinkler Rough-in/Hydro5/2/20085/6/20085/6/2008APASS
DetailsTroy Cobbley
Above ground hydro test passed.
INSP-Sprinkler Rough-in/Hydro5/1/20085/2/20085/2/2008PFAIL
DetailsTroy Cobbley
Above ground hydro test failed due to leaks. To be rescheduled for monday.
INSP-Sprinkler Rough-in4/3/20084/4/20084/4/2008PPASS
DetailsTroy Cobbley
The remaining underground piping is ok to cover.
PLANS/APPL TAKEN TO FRONT DESK  3/28/2008 DONE
Telephone call  3/28/2008 DONE
t/c w chris wilson at ###-#### - permit ready and fees given
Permit Ready to Issue  3/28/2008 DONE
Issue and Print Permit  3/28/2008 DONE
Inspection Record Card- Fire3/28/2008 3/28/2008 DONE
DetailsPatricia Smith
Sprinkler Plan Check1/14/2008 3/27/2008 PASS
Details
approved w/ conditions
Sprinkler Plan Check3/25/2008 3/25/2008 DONE
DetailsSam Rogers
Engineering evaluation of the new tank and existing well supply by J. L. O'Neal, P.F.E. was reviewed by D. Hanneman, Fire Marshal, and found acceptable as an approved alternative design for this specific temporary situation. Signed documents attached to this case and faxed back to architect.
Plan resubmittals received  3/19/2008 DONE
Letter from architect and PE evaluation of tank and well pump water supply
Telephone call  2/4/2008 DONE
Confirming my telcon with Gregg Patrick, TVFP, ph: ###-####. TVFP needs to start installation of UG piping between the proposed tank and the building within two weeks. I suggested they submit plans and application for an Underground Fire permit. We will not release approved overhead sprinkler plans until we have approved the fire protection water tank plans and confirmed the proposed water supply curve, to be used for the overhead sprinkler design. I explained the fire tank plans need to be designed to NFPA 22 Standards and be stamped by a State licensed PE qualified in FP design. Gregg offered to work with the contractor to get the proper plans and design information prepared and submitted under a separate FIR permit, since the tank installation is not a part of TVFP's contract.
Regards,
Sam
Case Summary  1/14/2008  
Application received  1/14/2008  
Pending Assignment by SAM1/14/2008   DONE
Plans sent to BJ.