Miscellaneous action | | | 5/13/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit approved for final status.
|
Pending Assignment by SAM | 1/17/2008 | | 9/21/2009 | | DONE |
Tisha Gallop
|
|
|
9/21/2009 16:59:42 LEG - activity updated through activity FIRA158 from case FIR09-00578.
|
INSP-Final Inspection | 9/14/2009 | 9/14/2009 | 9/15/2009 | P | NR |
Forrest France
|
|
|
Work incompleted on correction notice items.
|
INSP-Final Inspection | 8/12/2009 | 8/14/2009 | 8/14/2009 | A | FAIL |
Forrest France
|
|
|
See stamped plan set for locations in need or revision including overspaced heads at the kitchen 103, one overspaced head at the basement hallway, one blocked upright at a closet 1st floor, need to provide access to three locked rooms and the elevator pit, one sw head at the stairway needs the travel cap removed, escutcheons missing at three heads.
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Troy Cobbley
|
|
|
Hydro Test Passed for wet and AnitFreeze
|
INSP-Sprinkler Rough-in/Hydro | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | FAIL |
Troy Cobbley
|
|
|
Hydro test was not even started due to the fitter finding a leak.
|
INSP-Final Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | NR |
Forrest France
|
|
|
casey - please call 1/2 hr prior Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/21/2009 | 1/22/2009 | 1/22/2009 | P | PART |
Forrest France
|
|
|
Verified resubmitted plans for installation changes at the 1st floor area funsten house, okay for ceiling cover as initialed and annotated with today's date, noted flex couplings to be provided at the floor penetration for the 4" main.
|
Issue and Print Permit | | | 11/18/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 11/17/2008 | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with tim ###-#### that permit and fees are ready are to be picked up
|
Permit Ready to Issue | | | 11/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 11/4/2008 | | 11/13/2008 | | PASS |
|
|
|
As-Built Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 11/4/2008 | | |
|
|
|
Plan mod Rec'd by Fedex; rec'd one copy of application and 4 copies of submittal packet and 4 copies of sheets FP-1, FP-2, FP-3; taken to fire review
|
Sprinkler Plan Check | 10/20/2008 | | 10/31/2008 | | FAIL |
|
|
|
These plans were denied due to missing information. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set of plans will be maintained for five working days.
|
Plan resubmittals received | | | 10/20/2008 | | |
|
|
|
Plan Mod, rec'd united water flow sheet, application, 2 copies of submittal packet and 4 copies of sheets FP-1, FP-2, FP-3; taken to fire review
|
Sprinkler Plan Check | 9/26/2008 | | 10/14/2008 | | FAIL |
|
|
|
These plans were denied due to non correlation between the plans and remote area calculation summary's submitted. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set of plans will be maintained for 5 working days.
|
Plan assigned to (SAM) | 9/26/2008 | | 9/26/2008 | | DONE |
Sam Rogers
|
|
|
|
Plan resubmittals received | | | 9/26/2008 | | |
Barbara Stitt
|
|
|
Recieved 1 cover transmittal, 1 cover letter regarding as built conditions, 1 application, 2 copies of water test information, 4 copies of as built fire protection drawings (sheets FP1-3), 2 copies of 2 sets of hydraulic cover sheet & calculations via mail delivery and put in fire inbox///9-26-08 BAS
|
INSP-Sprinkler Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | FAIL |
Forrest France
|
|
|
On site visit to confirm notes per last inspection completed 8/19. Dry upright sprinkler coverage is overspaced or missing at several locations, noted several field modifications which will necessitate resubmitted plans matching the installation.
|
INSP-Sprinkler Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Forrest France
|
|
|
Chris- call 30 min prior to going to meet Phone #: ###-#### No access yet provided to inspect dry uprights as noted per last site visit completed 8/19, inspection rescheduled per phone conversation.
|
Meeting | | | 8/28/2008 | | DONE |
|
|
|
Walk-in meeting with Laura Bachelor, Cooperative Preschool at St. Michaels (###-####) inquiring if the City had ordered her preschool to vacate the building as a result of the recent "failed" sprinkler inspection. I indicated the PDS/Fire Division had not done so and that per my discussion with Carl Westfall, (building plan reviewer), the City had not required the building to be vacated during the Building permit construction period. I indicated it may be necessary to vacate the area for practical purposes to accommodate the additional sprinkler work and related construction work but that decision would be the building owner's, not the City's in this case.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Resubmittals are needed showing the upright heads being changed to pendant heads, added upright heads in the daycare/remote area, and all of the added pendants in the closets. The entire space above the ceiling, in the daycare, will need to be covered with sprinklers or a code based solution provided. Access shall be provided to view the dry upright sprinkler heads. The uprights have been deleted from the corridors but there is exposed wood above the ceilings in the corridors. Reducing fittings have been used and are not allowed per NFPA 13 unless the exception is met.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2008 | 6/12/2008 | 6/12/2008 | P | NR |
Forrest France
|
|
|
Jerry Phone#: ###-####
|
INSP-Sprinkler Rough-in | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PART |
Troy Cobbley
|
|
|
This inspection was for the installation of the 4" PIV. The PIV can be covered. I let the contractor know that it would be a good idea to get the conduit for the tamper switch installed prior to bury.
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | FAIL |
Forrest France
|
|
|
See approved plan set for attic area clouded per inspection completed today-noted one hanger at the 4" main to be reattatched, one missing hanger, and one upright head blocked by and adjacent truss web.
|
INSP-Sprinkler Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | NR |
Forrest France
|
|
|
jerry Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/1/2008 | 5/1/2008 | 5/5/2008 | P | PART |
Forrest France
|
|
|
OH fire sprinkler okayed for cover at the hard lid intermediate landing adjacent to the east stairway.
|
INSP-Sprinkler Rough-in | 4/15/2008 | 4/15/2008 | 4/16/2008 | P | PART |
Forrest France
|
|
|
See approved plans for hard lid restroom areas at the basement okayed for cover.
|
INSP-Sprinkler Rough-in | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Forrest France
|
|
|
Ok to cover main entance of Bishop tuttle house room# 109 stairwell.KR
|
INSP-Conference | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | DONE |
Troy Cobbley
|
|
|
Jerry wanted to know precedures for getting some of the sprinkler piping covered. I notified him we could do partial rough-in sprinkler inspections.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 3/21/2008 | | 3/21/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 3/21/2008 | | DONE |
|
|
|
lft vm with mikc ###-#### and tlk with tim ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/21/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/21/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/13/2009 | | 3/19/2008 | | PASS |
|
|
|
These plans were approved with conditions by Bryan Johnson
|
Plan resubmittals received | | | 3/13/2008 | | |
|
|
|
received application and five sets of plans with submittal information; taken to fire review
|
Telephone call | | | 2/11/2008 | | DONE |
|
|
|
Call from Ben Hill, regarding status of Fire Sprinkler plan review. plans have not been logged back into city, as of yet. Log book indicates a note stating "hold". Reffered Mr. hill to Johnson Consulting for explanation.
|
Application received | | | 1/17/2008 | | |
|
|
|
|
Sprinkler Plan Check | 1/17/2008 | | 2/6/2007 | | FAIL |
|
|
|
These plans were denied due to missing and incorrect information provided. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for five working days
|