INSP-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PART |
Forrest France
|
|
|
OH modifications are approved for cover, work completed per plans and attatched documentation.
|
Issue and Print Permit | | | 3/31/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2008 | | |
|
|
|
Plan modification. An additional sprinkler permit fee applies, based on 4 heads affected.
|
Sprinkler Plan Check | | | 3/27/2008 | | PASS |
|
|
|
this is a plan modification, plans approved onsite by T. Cobbley. The currently issued permit and plan approval were only for demolition work. A plan mod fee applies for this plan modification, for 4 additional heads, to be installed in the plenum space. Sprinkler design approval is based on an alternative design proposal, approved by D. Hanneman and S. Rogers. No building plan modification is involved, as the anechoic chamber is consider a piece of equipment, per J. Menard. Signed agreement attached under Documents.
|
Plan resubmittals received | | | 3/27/2008 | | DONE |
|
|
|
Plan modification to add sprinklers in plenum
|
Issue and Print Permit | | | 2/7/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/31/2008 | | 1/31/2008 | | PASS |
|
|
|
On site review by TC. Plans approved for demolition work to proceed with the condition that installation work occur within 30 days.
|
Plan assigned to (Scott) | | | 1/23/2008 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 1/23/2008 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|