Miscellaneous action | | | 6/4/2008 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 2/20/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/7/2008 | 2/8/2008 | 2/8/2008 | P | CANC |
Troy Cobbley
|
|
|
Per rick there are phone line problems. Will be rescheduled.
|
Inspection Record Card- Fire | 1/30/2008 | | 1/30/2008 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 1/30/2008 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 1/23/2008 | | 1/29/2008 | | PASS |
Michael Timmerman
|
|
|
1/29/2008 11:07:23 MWT - activity updated through activity FIRA22 from case FIR08-00057.
|
Alarm Plan Check | 1/29/2008 | | 1/29/2008 | | PASS |
Sam Rogers
|
|
|
Received cover letter from PE and one set of the approved shop drawings with his signature verifying compliance with his design.
Plans now passed and ready to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/28/2008 | | |
|
|
|
Received letter and stamped plans from Eidam and Assoc.; taken to Sam R.
|
Alarm Plan Check | 1/25/2008 | | 1/25/2008 | | PEND |
Michael Timmerman
|
|
|
Fire Alarm Review 1st
|
Telephone call | | | 1/25/2008 | | DONE |
|
|
|
Called Dave Maxwell let Dave know that I need a review letter from the design engineer Geoff Johnson at Eidam & Associates before I can Issue the permit. Dave said he would get it for me.
|
Miscellaneous action | | | 1/25/2008 | | DONE |
|
|
|
Pan review complete on hold waiting for Letter of review from design engineer.
|
Case Summary | | | 1/23/2008 | | |
|
|
|
|
Application received | | | 1/23/2008 | | |
|
|
|
|