INSP-Final Inspection | 7/22/2008 | 7/23/2008 | 7/23/2008 | P | PASS |
Forrest France
|
|
|
Field verified necessary corrections, fire sprinkler permit finaled.
|
INSP-Final Inspection | 5/28/2008 | 5/29/2008 | 5/29/2008 | A | FAIL |
Forrest France
|
|
|
Correction items are not complete, still require alarm line shutoff valve supervision at all six risers.
|
INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 | P | FAIL |
Forrest France
|
|
|
Alarm line isolation valves must be secured in the open position(all risers), riser #6 pressure switch does not reset when trim line water psi is relieved.
|
INSP-Sprinkler Rough-in/Hydro | 3/7/2008 | 3/7/2008 | 3/7/2008 | A | NR |
Forrest France
|
|
|
Need to complete main drain piping, also need to test fire alarm interconnections.
|
INSP-Sprinkler Rough-in/Hydro | 2/1/2008 | 2/4/2008 | 2/4/2008 | P | PART |
Forrest France
|
|
|
Rough-in installation is acceptable as completed to date, need to provide protection for exposed bolts at flanges below grade as discussed, drains are not yet complete, will need to test alarm and tamper switches in conjunction with a fire alarm permit as required for relocation of the supervisory and alarm device connections.
|
Issue permit | | | 1/29/2008 | | |
|
|
|
|
Sprinkler Plan Check | 1/28/2008 | | 1/28/2008 | | PASS |
Scott Arellano
|
|
|
|
Application received | | | 1/28/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/28/2008 | | 1/28/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/28/2008 | | DONE |
|
|
|
left message w connie for jim danes at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/28/2008 | | DONE |
|
|
|
|
Case Summary | | | 1/25/2008 | | DONE |
|
|
|
|
Application received | | | 1/25/2008 | | |
|
|
|
|
Pending Assignment by SAM | 1/25/2008 | | | | |
|
|
|
|