INSP-Final Inspection | 7/20/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Forrest France
|
|
|
Required corrections verified for compliance, fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/17/2008 | 7/18/2008 | 7/18/2008 | A | FAIL |
Forrest France
|
|
|
See annotations on stamped plan set for locations in need of repair including one painted upright head, one pendent blocked by an adjacent light fixture at the women's locker room, one missing escutcheon, two heads blocked by insulation at the ceiling in the OTS storage room.
|
INSP-Sprinkler Rough-in | 6/27/2008 | 6/30/2008 | 6/30/2008 | A | FAIL |
Forrest France
|
|
|
See annotations on plan for areas in need of revision including missing head coverage at a storage room, two missing armover hangers, three painted heads to be replaced, and one pendent cut too high. Remainder of overhead system modifications are good for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | PART |
Forrest France
|
|
|
Inspection completed for hard lid areas finished to date, okayed for cover storage rooms 129A, 108A, work room 128, mens restrooms 147 and 148, womens restroom 145. NOTE: no approval for cover at womens restroom 149 due to missing hanger at the arm-over to the pendent head, see stamped plan set for annotations.
|
INSP-Sprinkler Rough-in | 4/21/2008 | 4/21/2008 | 4/22/2008 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for new areas above hard lids that are marked ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/16/2008 | 4/16/2008 | 4/16/2008 | P | NR |
Forrest France
|
|
|
Work is not completed for inspection per contractor as requested.
|
Issue and Print Permit | | | 2/12/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 2/11/2008 | | 2/11/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/11/2008 | | DONE |
|
|
|
tlk to secretary for trent bice ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/11/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/25/2008 | | 2/7/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Case Summary | | | 1/25/2008 | | |
|
|
|
|
Application received | | | 1/25/2008 | | |
|
|
|
|
Pending Assignment by SAM | 1/25/2008 | | | | |
|
|
|
|