Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 12/23/2008 | 12/24/2008 | 12/24/2008 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 12/22/2008 | 12/23/2008 | 12/23/2008 | P | CANC |
Forrest France
|
|
|
Please coordinate with alarm star Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/15/2008 | P | PASS |
Troy Cobbley
|
|
|
Aboveground and Under ground Hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | FAIL |
Troy Cobbley
|
|
|
No access to the riser room. No one on the job site.
|
INSP-Sprinkler Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PART |
Troy Cobbley
|
|
|
The lateral earthquake bracing is overspaced. The branchline piping sizing below the mezzanine does not match the approved drawings. This area is a remote area. Resubmitt plans showing the pipe size revisions and revised hydraulic calculations.
|
INSP-Supply line flush | 4/10/2008 | 4/11/2008 | 4/11/2008 | P | PASS |
Troy Cobbley
|
|
|
UG flush passed
|
INSP-Sprinkler Rough-in | 2/19/2008 | 2/20/2008 | 2/20/2008 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover
|
Issue and Print Permit | | | 2/19/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2008 | | 2/8/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/8/2008 | | DONE |
|
|
|
lft ms with secretary for Trent Bice ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/8/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/30/2008 | | 2/7/2008 | | PASS |
|
|
|
Plans are Approved with Condition by Bryan Johnson
|
Application received | | | 1/30/2008 | | |
|
|
|
|
Pending Assignment by SAM | 1/30/2008 | | | | |
|
|
|
|