Permit Information
Permit NumberFIR08-00085
StatusFinaled
Name UNITED FIRE PROTECTION LLC
Site Address 10005 W PATTIE DR
Project Name 
Customer Number 
ePlanReview 
Description
overhead Scope of Work
Beginning from the Capped under ground supply, install a 1.5” Back Flow Device and wet riser. The wet system will serve through out this existing single story structure. In accordance with NFPA 13D. System shall be equipped with an alarm initiating device and an outside alarm. All fire sprinkler work and related, which includes dual use, single service water supply, the system backflow prevention device (provided by others), shall be per IFC2006 903, NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: Under Ground Permit # FIR08-00470.03/18/08 Plan Review Comments:
These previously approved plans were resubmitted as an as-built set for review. As a result of changes to the piping plan during construction, the approved hydraulic calculations were affected. A new set of calculations have also been resubmitted for review. The revisions are noted as Rev. 1 and dated 03/07/08. These modifications affected 3 heads with in the remote area of operation
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/20/20083/20/20083/20/2008PPASS
DetailsTroy Cobbley
permit passed
Issue and Print Permit  3/20/2008 DONE
Plan assigned to (SAM)3/7/2008 3/19/2008 PASS
DetailsCathy Brown
3/19/2008 16:24:45 CMB - activity updated through activity FIRA22 from case FIR08-00085.
PLANS/APPL TAKEN TO FRONT DESK  3/19/2008  
Telephone call  3/19/2008 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  3/19/2008 DONE
Inspection Record Card- Fire3/19/2008 3/19/2008 DONE
DetailsCathy Brown
Sprinkler Plan Check3/7/2008 3/18/2008 PASS
Details
*As built Plans & calculations are approved by Bryan Johnson
INSP-Sprinkler Rough-in3/12/20083/12/20083/12/2008PPASS
DetailsTroy Cobbley
The piping can be covered by the deco shield.
INSP-Sprinkler Rough-in3/7/20083/7/20083/7/2008PPASS
DetailsTroy Cobbley
The tenting inspection is passed. The sprinkler piping can be covered with the blow-in insulation.
Plan resubmittals received  3/7/2008  
Plan modification submitted: received application, four books of submittal info and four copies of sheets FP1; taken to fire review
INSP-Sprinkler Rough-in2/25/20082/25/20082/25/2008PPART
DetailsTroy Cobbley
Rough-in inspection passed. Plans are being resubmitted as per Ben due to sprinkler heads being changed which is effecting the K factor. Piping in the kitchen wall can be covered. A tenting inspection will be required prior to covering with insulation.
Issue and Print Permit  2/21/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/20/2008  
Inspection Record Card- Fire2/20/2008 2/20/2008 DONE
DetailsCathy Brown
Telephone call  2/20/2008 DONE
lft ms with secretary for ben chavez ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  2/20/2008 DONE
Miscellaneous action  2/19/2008 DONE
The application for a building permit for this project has been denied due to zoning conflict. The matter is being addressed by the building owner and planning and zoning.
Sprinkler Plan Check2/1/2008 2/17/2008 PASS
Details
Plans are approved by Bryan Johnson
Application received  2/1/2008  
Pending Assignment by SAM2/1/2008