INSP-Final Inspection | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler modifications passed final inspection.
|
INSP-Sprinkler Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PART |
Forrest France
|
|
|
OH system modifications are good for cover per the scope of permit work.
|
Issue and Print Permit | | | 2/11/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/6/2008 | | 2/8/2008 | | DONE |
Patricia Smith
|
|
|
approved as submitted by bryan johnson
|
Inspection Record Card- Fire | 2/8/2008 | | 2/8/2008 | | DONE |
Patricia Smith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/8/2008 | | DONE |
|
|
|
tlk to mike oswalk ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/8/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/6/2008 | | 2/6/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed corrections to Mike Oswald.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/6/2008 | | |
|
|
|
received "3" sets of plans including fire app.--plans put on fire shelf
|
Sprinkler Plan Check | 2/6/2008 | | 2/6/2008 | | FAIL |
|
|
|
|
Plan assigned to (Scott) | 2/6/2008 | | 2/6/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/6/2008 | | DONE |
|
|
|
tlk to mike to let him that fire review has failed
|
Case Summary | | | 2/5/2008 | | DONE |
|
|
|
|
Application received | | | 2/5/2008 | | |
|
|
|
|
Pending Assignment by SAM | 2/5/2008 | | | | |
|
|
|
|