Miscellaneous action | | | 5/8/2009 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 3/20/2009 | 3/23/2009 | 3/23/2009 | A | PASS |
Forrest France
|
|
|
Recieved NFPA 72 documents per request, resubmittals verified, fire alarm permit finaled.
|
Issue and Print Permit | | | 3/20/2009 | | DONE |
|
|
|
|
Alarm Plan Check | | | 3/16/2009 | | PASS |
|
|
|
Approved plan nodifications as revised by R. Gobler on 3/10/09; approval per "red" plan annotations, no written review comments required. FF
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/16/2009 | | DONE |
|
|
|
left vm for robert gobler at ###-#### - permit ready to be picked (resubmittal)
|
Permit Ready to Issue | | | 3/16/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/16/2009 | | 3/16/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 3/9/2009 | | 3/9/2009 | | PEND |
Sam Rogers
|
|
|
3/9/09 Met with Rober Gobler and discussed plan discrepancies and omissions. He will make annotated corrections in "red" with his initials on all plan sets at the plan desk here in the PDS office and and return the corrected plans to the permit counter. Plans left at the front counter for him to obtain later this afternoon to make corrections.
|
Plan resubmittals received | | | 2/25/2009 | | |
|
|
|
Plan modification: Received application, three copies of submittal info binder, and plan sheets F0.0, F1.0, F1.1, F1.2, F1.3, F1.4, F1.5, F1.6, F1.7, F2.0 taken to Fire Review
|
INSP-Alarm Testing | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Forrest France
|
|
|
Remainder of fire alarm testing completed satisfactory, noted corrections have been finished, elevator, FACP, balance of notification, etc. all tested okay. Final pending one SD for door release at the trash room level P1 to be tested (missing power to overhead door), and provision of resubmittal plans for field modifications including added ID detectors, hoistway devices, deleted points, accurate matrix, etc. as discussed.
|
INSP-Alarm Testing | 2/18/2009 | 2/19/2009 | 2/19/2009 | P | PART |
Forrest France
|
|
|
One damper 6th floor and two dampers 1st floor need repair, notification and unit smoke alarms 1st thru 6th floors tested acceptable, noted corrections made, verified signals sent from previous inspection, see plans for red line annotations on adjustments to be done.
|
INSP-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PART |
Forrest France
|
|
|
Sprinkler system interconnections to the fire alarm panel for trouble, supervisory, and alarm conditions completed satisfactory.
|
INSP-Alarm Testing | 2/16/2009 | 2/17/2009 | 2/18/2009 | P | PART |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Gobler
|
INSP-Alarm Testing | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | PART |
Forrest France
|
|
|
Walkthrough completed at all floor levels, see plan annotations for areas in need of correction.
|
FIR-Aging Inspection | 6/2/2008 | 6/2/2008 | 6/2/2008 | | DONE |
Forrest France
|
|
|
Work in progress, under construction.
|
Issue and Print Permit | | | 2/28/2008 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 2/6/2008 | | 2/25/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire review notes for comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 2/25/2008 | | 2/25/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/25/2008 | | DONE |
|
|
|
t/c w robert gobler at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/25/2008 | | DONE |
|
|
|
|
Case Summary | | | 2/6/2008 | | |
|
|
|
|
Application received | | | 2/6/2008 | | |
|
|
|
|
Plan assigned to (SAM) | 2/25/2009 | | | | |
Sam Rogers
|
|
|
|