Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberFIR08-00115
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 2745 S VICTORY VIEW WAY
Project NameCAPITOL STEEL CONSTRUCTORS INC
Customer Number 
ePlanReview 
Description
Revised Work Scope: Rev 1, dated 06/12/08
Plans and calculations were resubmitted based on changes made in the field during construction. Remote are 2 was altered by substituting steal pipe with CPVC. Based on the calculations submitted, the modification does not appear to have adversely affected the operation of the system. overhead Work Scope:
Capital Steel Constructors (Shell Only) - To construct a new 6,000 square foot, one story, pre-engineered office and warehouse building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. This building was designed for two future 3,000 square foot tenant spaces. Separate tenant improvement permits will be required to finish this building for occupancy. The south half of this building is being finished for Capital Steel Constructors under tenant improvement permit BLD07-02324. All construction per the approved plans and attached comment list.
Beginning from an existing supply and an 8” flange located at the North West corner of the bldg. install a 3” wet riser and wet pipe system to serve through out the entire bldg. The system supply will be controlled remotely from a post indicating valve. The system is designed to Ordinary Group II for shell protection of the Warehouse space and light hazard in the Office space.
The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02321 & UG FITR08-00077.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/10/2009 DONE
Sent for archiving
INSP-Final Inspection12/23/200812/24/200812/24/2008APASS
DetailsForrest France
Fire sprinkler final inspection passed, see activity notes under attatched project UG permit FIR08-00077 for logged inspection activities related to this overhead permit. NOTE: contractor to provide backflow certification for the DCVA as discussed prior to next TI final.
Issue and Print Permit  7/31/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/24/2008 DONE
DetailsCathy Brown
Inspection Record Card- Fire6/24/2008 6/24/2008 DONE
DetailsCathy Brown
Telephone call  6/24/2008 DONE
DetailsCathy Brown
tlk to secretary for trent bice at ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/24/2008 DONE
DetailsCathy Brown
Sprinkler Plan Check6/17/2008 6/22/2008 PASS
Details
This was the 2nd review of these previously approved plans. The approved plans were modified in the field by the contractor as material substitution and pipe size changes resulting in the alteration of the remote area of operation. A total of 10 heads in the remote area#2 were affected by this modification.
Plan resubmittals received  6/17/2008  
received "4" sets of plans with app
FIR-Aging Inspection6/10/20086/10/20086/10/2008 NR
DetailsTroy Cobbley
work is in progress
Issue and Print Permit  3/11/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/10/2008 DONE
Telephone call  3/10/2008  
tlk to secretary for trent bice ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  3/10/2008  
Inspection Record Card- Fire3/10/2008 3/10/2008 DONE
DetailsCathy Brown
Sprinkler Plan Check2/8/2008 2/29/2008 PASS
Details
Plans & calculations are approved by Bryan Johnson
Application received  2/8/2008  
Case Summary  2/8/2008 DONE
Pending Assignment by SAM2/8/2008