Permit Information
Permit NumberFIR08-00141
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 950 W BANNOCK ST Unit: 1050
Project NameClearwater Advisors Expansion
Customer Number 
ePlanReview 
Description
The Scope of Work: (Clearwater Advisors Expansion) Add open office, offices, Conference room, and new restroom. Ext 1hr corridor and install 3 20 min doors. This (10,922 square feet) office tenant space on the 10th story of a high-rise building. Work is to include interior Nordwall demountable nonbearing partitions, interior doors, sidelights, millwork, and finishes. The access floor system and the suspended ceilings were installed under permit BLD05-02939. The shell and core, including the core restrooms, were constructed under permit BLD04-02348. The work is required to comply with the approved drawings, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department.
The fire sprinkler work consists of adding and relocating heads to accommodate a new wall and ceiling layout. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with IFC 2006 & NFPA 13 2007 as regulated by the Fire Department.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. The permit is attached to BLD08-00130.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/18/20086/19/20086/19/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection6/19/20086/19/20086/19/2008PDEFR
DetailsForrest France
Duplicate inspection request
INSP-Sprinkler Rough-in4/1/20084/1/20084/1/2008PPART
DetailsForrest France
OK to cover, see red lined notes on approved set of plans.KR
Inspection Record Card- Fire3/10/2008 3/10/2008 DONE
DetailsPatricia Smith
PLANS/APPL TAKEN TO FRONT DESK  3/10/2008 DONE
Telephone call  3/10/2008 DONE
t/c w brodie at ###-#### - permit ready and fees given
Permit Ready to Issue  3/10/2008 DONE
Issue and Print Permit  3/10/2008  
Sprinkler Plan Check2/20/2008 3/9/2008 PASS
Details
plans are approved as submitted by bryan johnson
Case Summary  2/20/2008 DONE
Application received  2/20/2008  
Pending Assignment by SAM2/20/2008