Miscellaneous action | | | 6/4/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 3/8/2012 | 3/12/2012 | 3/12/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 1/18/2012 | 1/18/2012 | 1/23/2012 | | NR |
Troy Cobbley
|
|
|
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
|
FIR-Aging Inspection | 9/12/2011 | 9/12/2011 | 9/15/2011 | | NR |
Troy Cobbley
|
|
|
I splok with Ernie, mall managment, and Joe with Lightining Electric, about getting this project inspected and finaled.
|
INSP-Conference | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Phil with Schindler elevator about the job status. He stated that the firemans hat was now functional and that Brian with Lighting Electric would be scheduling the inspection.
|
FIR-Aging Inspection | 4/27/2011 | 4/27/2011 | 5/5/2011 | | NR |
Troy Cobbley
|
|
|
I spoke to Tammy with SimplexGrinnell about getting work completed and the inspection finaled. She is following up and will contact me with the project status.
|
FIR-Aging Inspection | 2/25/2011 | 2/25/2011 | 3/1/2011 | | NR |
Troy Cobbley
|
|
|
I spoke to Brian with Lightning Electric about the job status
|
INSP-Alarm Testing | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved drawings and a flashing hat in the elevator car when the shaft and machine room detector is activated.
|
FIR-Aging Inspection | 11/23/2010 | 11/23/2010 | 11/24/2010 | | NR |
Troy Cobbley
|
|
|
I spoke to Brian with Lighting Electric, who was with Ernie, and they were going to address this permit. I also spoke to Charlie with SimplexGrinnell.
|
INSP-Final Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 | A | CANC |
Troy Cobbley
|
|
|
Inspection Canceled. Per the contractor, the elevator contractor was unavailable.
|
Telephone call | | | 4/19/2010 | | DONE |
|
|
|
Spoke to Charlie, he indicated this permit would be called in this week.
|
INSP-Final Inspection | 6/9/2009 | 6/11/2009 | 6/11/2009 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 6/9/2009 at 7:54:26 AM. Contact: ###-####.
|
INSP-Final Inspection | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | FAIL |
Troy Cobbley
|
|
|
The elevator contractor could not find a reset key at first. After the key was found the beam detector in the main corridor was tested. The elevator recalled to the second floor but would not reset. The elevator contractor was trying to trouble shoot the problem when I left.
|
Telephone call | | | 5/8/2009 | | DONE |
|
|
|
spoke to Charlie Bayne who stated work is still in progress
|
FIR-Aging Inspection | 5/27/2008 | 5/27/2008 | 5/28/2008 | | NR |
Troy Cobbley
|
|
|
wip
|
Issue and Print Permit | | | 2/26/2008 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 2/21/2008 | | 2/25/2008 | | PASS |
Michael Timmerman
|
|
|
2/25/2008 09:33:38 MWT - activity updated through activity FIRA22 from case FIR08-00143.
|
Alarm Plan Check | 2/25/2008 | | 2/25/2008 | | DONE |
Troy Cobbley
|
|
|
This was a quick permit. The operation of the fireman's hat upon lobby smoke detector activation was unclear. I spoke to Charlie about this and notes have been made on the drawings stating compliance is required with the elevator code. This will be field verified by the fire inspector. There are no separate written comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2008 | | DONE |
Troy Cobbley
|
|
|
|
Inspection Record Card- Fire | 2/25/2008 | | 2/25/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/25/2008 | | DONE |
|
|
|
left vm for charlie bayne at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/25/2008 | | DONE |
|
|
|
|
Application received | | | 2/21/2008 | | |
|
|
|
|