Miscellaneous action | | | 5/8/2009 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | FAIL |
Troy Cobbley
|
|
|
The a/v's have been lowered and function correctly. The pull stations function correctly however they respond as a zone 6 instead of a zone 1 as shown on the approved drawings. For a final the contractor needs to provide a map at the facp, as-builts with the zone change shown and testing of the duct smoke detectors as previously discussed. This includes a manometer test. The signals do go off site as verified by the fire dept responding to the testing.
|
INSP-Final Inspection | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | FAIL |
Troy Cobbley
|
|
|
All of the wall mounted strobes are mounted too high. The duct smoke detectors are not sampling all of the airflow. The fire alarm wiring in the attic space has not been attached to the building structure as required per NEC. No testing was performed.
|
Issue and Print Permit | | | 3/4/2008 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 2/21/2008 | | 3/3/2008 | | PASS |
Kenneth R Roule
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 3/3/2008 | | 3/3/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 3/3/2008 | | DONE |
|
|
|
left message w ali for matt casey at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/3/2008 | | DONE |
|
|
|
|
Case Summary | | | 2/21/2008 | | DONE |
|
|
|
|
Application received | | | 2/21/2008 | | |
|
|
|
|