INSP-Final Inspection | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, paper bags at heads in the kennel area to be removed prior to structural final as agreed.
|
INSP-Sprinkler Rough-in | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications are approved for cover at the drop ceiling, final pending ceiling tile and escutcheons.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/21/2008 | | 2/21/2008 | | PASS |
Scott Arellano
|
|
|
|
Inspection Record Card- Fire | 2/21/2008 | | 2/21/2008 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 2/21/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/21/2008 | | DONE |
|
|
|
|
Application received | | | 2/21/2008 | | |
|
|
|
|
Pending Assignment by SAM | 2/21/2008 | | | | |
|
|
|
|