INSP-Final Inspection | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection. Noted existing vault coverage exempted with fire chief D. Hanneman's approval per IFC 2006 sec. 903.3.1.1.1 and 904.2 including the installed automatic fire extinguishing system.
|
INSP-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | FAIL |
Forrest France
|
|
|
Missing coverage at the vault, remainder of tenant remodel work per the permit scope is acceptable.
|
INSP-Final Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | NR |
Forrest France
|
|
|
matt Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PART |
Forrest France
|
|
|
Overhead rough-in is approved for cover as noted on plans.
|
INSP-Sprinkler Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 | A | PART |
Forrest France
|
|
|
See additional areas on stamped plans red lined and initialed with todays date okayed for ceiling cover.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2008 | 3/12/2008 | 3/12/2008 | A | PART |
Forrest France
|
|
|
Sprinkler system modifications are approved for ceiling cover at locations annotated and initialed with todays date on stamped plan set.
|
Issue and Print Permit | | | 3/4/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/3/2008 | | 3/3/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 3/3/2008 | | DONE |
|
|
|
tlk to tom dutkus ###-#### that that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/3/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/28/2008 | | 2/28/2008 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2008 | | DONE |
|
|
|
|
Application received | | | 2/27/2008 | | |
|
|
|
|
Pending Assignment by SAM | 2/27/2008 | | | | |
|
|
|
|