INSP-Final Inspection | 9/12/2008 | 9/12/2008 | 9/12/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Forrest France
|
|
|
Listed correction notice items are complete, overhead work passed inspection, final pending alarm testing for riser flow and tamper switches.
|
INSP-Final Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | A | FAIL |
Forrest France
|
|
|
One upright head adjacent to the mech. room is too close to the wall, FDC piping needs a hanger on the horizontal piece and bracing/support for the vertical run, missing PRV at the riser, noted one added head at the electrical room. Riser needs calc. stickers, signage, backflow certification, forward flow test, and tamper/flow testing in conjunction with the fire alarm work.
|
INSP-Final Inspection | 9/8/2008 | 9/8/2008 | 9/9/2008 | P | NR |
Forrest France
|
|
|
Need approved plans on site.
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed okay on the second visit after valve adjustment by United water.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PART |
Forrest France
|
|
|
Remainder of UG fire supply approved for cover including thrust blocks and ductile riser.
|
INSP-Sprinkler Rough-in | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line approved for cover with the exception of the thrust blocks not yet poured at the 90 and stub-in, also need to provide method for seismic clearance at the ductile riser and floor slab interface.
|
INSP-Sprinkler Rough-in | 5/21/2008 | 5/22/2008 | 5/22/2008 | P | FAIL |
Forrest France
|
|
|
Missing thrust blocks, ductile stub is not installed, point of connection to the first 90 is already covered by bedding material effectively concealing the work-pipe size and type, trace wire, depth of bury, etc. cannot be verified at this time due to cover.
|
Issue and Print Permit | | | 3/26/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2008 | | 3/14/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 3/14/2008 | | DONE |
|
|
|
left vm for trent bice at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/14/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/28/2008 | | 3/12/2008 | | PASS |
|
|
|
plans and calculations are approved
|
Application received | | | 2/28/2008 | | |
|
|
|
|
Case Summary | | | 2/28/2008 | | |
|
|
|
|