INSP-Final Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2008 | 7/24/2008 | 7/24/2008 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 6/30/2008 | 7/1/2008 | 7/1/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed okay
|
INSP-Sprinkler Rough-in | 6/27/2008 | 6/30/2008 | 6/30/2008 | P | CANC |
Forrest France
|
|
|
UG Flush Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 3/20/2008 | 3/21/2008 | 3/21/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line is acceptable for cover including the ductile riser stub.
|
Inspection Record Card- Fire | 3/14/2008 | | 3/14/2008 | | DONE |
Patricia Smith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2008 | | DONE |
|
|
|
left message w brittney for gerald ebeling at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/14/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/14/2008 | | DONE |
|
|
|
|
Plan assigned to (OutSourced) | 3/5/2008 | | 3/12/2008 | | PASS |
|
|
|
|
Sprinkler Plan Check | 3/5/2008 | | 3/12/2008 | | PASS |
|
|
|
plans approved
|
Application received | | | 3/5/2008 | | |
|
|
|
|