Work Scope: OH Scope: Beginning from an existing supply 6” supply located within a 1 hour rated riser room at the North East corner of the bldg. install a 6” wet riser and wet pipe grid system to serve through out the entire bldg. The system is designed to Ordinary Group II for Mezzanine area, Light Hazard through out the office area and designed to protect Class I – IV commodity up to 16’ in a palletized solid pile, bin box or shelf storage arrangement through out the warehouse.
The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02854. The underground was previously approved under separate permit # FIR08-00148.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/15/200810/15/200810/15/2008PPASS
DetailsTroy Cobbley
Fire sprinkler permit finaled.KR
INSP-Final Inspection10/13/200810/14/200810/14/2008PCANC
DetailsTroy Cobbley
Final Inspection - Contact: Todd Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro9/10/20089/11/20089/11/2008APASS
DetailsTroy Cobbley
Forward Flow Test passed
INSP-Sprinkler Rough-in/Hydro9/5/20089/8/20089/8/2008APASS
DetailsTroy Cobbley
The remaining sprinkler piping above the lay-in ceilings can be covered.
INSP-Supply line flush8/5/20088/5/20088/5/2008PPASS
DetailsTroy Cobbley
OH Hydro Passed
INSP-Sprinkler Rough-in/Hydro8/4/20088/4/20088/4/2008PPASS
DetailsTroy Cobbley
See the approved plans for locations where the sprinkler piping above the hard lids can be covered.
INSP-Sprinkler Rough-in7/17/20087/18/20087/18/2008PPASS
DetailsTroy Cobbley
The overhead rough-in inspection passed.
FIR-Aging Inspection6/26/20086/26/20086/26/2008 DONE
DetailsForrest France
Site visit confirmed construction underway, work in progress.
Issue and Print Permit  3/27/2008 DONE
Inspection Record Card- Fire3/26/2008 3/26/2008 DONE
DetailsPatricia Smith
PLANS/APPL TAKEN TO FRONT DESK  3/26/2008 DONE
Telephone call  3/26/2008 DONE
t/c w shaun ramsey at ###-#### - permit ready and fees givin
Permit Ready to Issue  3/26/2008 DONE
Sprinkler Plan Check  3/24/2008 FAIL
DetailsSam Rogers
Plan review by B. Johnson. Following comments were emailed to the sprinkler contractor, 3//24/08.
These plans have been put on hold until the following 3 items have been supplied to the plans examiner.
1. A complete description of the commodities being stored in the warehouse space.
2. Provide minimum starting head pressure and gpm for the office area.
3. Will there been any overhead doors installed in the warehouse? If so will there be any obstructions?
Bryan Johnson
Johnson Consulting
3362 North Cafferty Way
Meridian, Idaho 82646
Cell ###-####
Sprinkler Plan Check3/6/2008 3/24/2008 PASS
Details
plans & calculations are approved
Application received  3/6/2008  
Pending Assignment by SAM3/6/2008