INSP-Final Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler permit finaled.KR
|
INSP-Final Inspection | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | CANC |
Troy Cobbley
|
|
|
Final Inspection - Contact: Todd Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2008 | 9/11/2008 | 9/11/2008 | A | PASS |
Troy Cobbley
|
|
|
Forward Flow Test passed
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2008 | 9/8/2008 | 9/8/2008 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping above the lay-in ceilings can be covered.
|
INSP-Supply line flush | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PASS |
Troy Cobbley
|
|
|
OH Hydro Passed
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | PASS |
Troy Cobbley
|
|
|
See the approved plans for locations where the sprinkler piping above the hard lids can be covered.
|
INSP-Sprinkler Rough-in | 7/17/2008 | 7/18/2008 | 7/18/2008 | P | PASS |
Troy Cobbley
|
|
|
The overhead rough-in inspection passed.
|
FIR-Aging Inspection | 6/26/2008 | 6/26/2008 | 6/26/2008 | | DONE |
Forrest France
|
|
|
Site visit confirmed construction underway, work in progress.
|
Issue and Print Permit | | | 3/27/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/26/2008 | | 3/26/2008 | | DONE |
Patricia Smith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/26/2008 | | DONE |
|
|
|
t/c w shaun ramsey at ###-#### - permit ready and fees givin
|
Permit Ready to Issue | | | 3/26/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 3/24/2008 | | FAIL |
Sam Rogers
|
|
|
Plan review by B. Johnson. Following comments were emailed to the sprinkler contractor, 3//24/08.
These plans have been put on hold until the following 3 items have been supplied to the plans examiner.
1. A complete description of the commodities being stored in the warehouse space.
2. Provide minimum starting head pressure and gpm for the office area.
3. Will there been any overhead doors installed in the warehouse? If so will there be any obstructions?
Bryan Johnson
Johnson Consulting
3362 North Cafferty Way
Meridian, Idaho 82646
Cell ###-####
|
Sprinkler Plan Check | 3/6/2008 | | 3/24/2008 | | PASS |
|
|
|
plans & calculations are approved
|
Application received | | | 3/6/2008 | | |
|
|
|
|
Pending Assignment by SAM | 3/6/2008 | | | | |
|
|
|
|