INSP-Final Inspection | 9/15/2008 | 9/17/2008 | 9/17/2008 | A | PASS |
Troy Cobbley
|
|
|
Testing for pre-action system completed. Tested interconnection to fire alarm panel also performed a foward flush. KR
|
INSP-Final Inspection | 9/10/2008 | 9/12/2008 | 9/12/2008 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: bruce stricker
|
Plan resubmittals received | | | 7/3/2008 | | |
|
|
|
received 1 comment,1 hazmat table,1 material safty data sheet,1 high rate max valve regulated lead acid battery techanical data and 3 copies of sheet A2.1 sent to Ken Roule in fire.
|
INSP-Sprinkler Rough-in/Hydro | 6/25/2008 | 6/26/2008 | 6/26/2008 | P | DONE |
Forrest France
|
|
|
Hydro test complete. KR
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2008 | 6/18/2008 | 6/18/2008 | A | PART |
Troy Cobbley
|
|
|
The 24 hour air test passed. The rough-in inspection passed. Two hangers in the west corridor need to be removed from the truss bracing and a missing hanger needs to be installed on the 2" branchline as discussed. Piping can be covered. Some sprinkler heads are overspaced as per the hydraulic calculations but the minumum gpm/psi required for the remote area exceeds the gpm/psi required for the larger square footage of the heads. I spoke to Brian about this issue as well. Piping can be covered. I spoke to the fire sprinkler contractor about the requirement for the forward flush and a 200lb hydro test.
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2008 | 6/17/2008 | 6/17/2008 | P | PART |
Troy Cobbley
|
|
|
The 24 hour air test was started at 9:45 with just over 40psi on the guage.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/1/2008 | | 4/1/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 4/1/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/14/2008 | | 4/1/2008 | | PASS |
Cathy Brown
|
|
|
4/1/2008 07:52:16 CMB - activity updated through activity FIRA22 from case FIR08-00203.
|
Sprinkler Plan Check | 3/14/2008 | | 3/31/2008 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson
|
Application received | | | 3/14/2008 | | |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 3/14/2008 | | DONE |
|
|
|
|