INSP-Final Inspection | 7/25/2008 | 7/25/2008 | 7/28/2008 | P | PASS |
Forrest France
|
|
|
Shell fire sprinkler permit okay for final.
|
INSP-Final Inspection | 7/21/2008 | 7/23/2008 | 7/23/2008 | P | NR |
Forrest France
|
|
|
Final pending completion of fire alarm interconnections for riser supervision.
|
INSP-Sprinkler Rough-in/Hydro | 7/21/2008 | 7/22/2008 | 7/22/2008 | P | PART |
Forrest France
|
|
|
OH hydrostatic retest passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Overhead hydrostatic test failed due to start pressure below 200 psi. (guage @ 176 psi).
|
Inspection Record Card- Fire | 4/4/2008 | | 4/4/2008 | | DONE |
Patricia Smith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2008 | | DONE |
|
|
|
t/c w gerald at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/4/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/4/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/18/2008 | | 3/31/2008 | | PASS |
|
|
|
plans & calculations are approved
|
Application received | | | 3/18/2008 | | |
|
|
|
|
Pending Assignment by SAM | 3/18/2008 | | | | |
|
|
|
|