INSP-Final Inspection | 5/9/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 4/18/2008 | 4/21/2008 | 4/21/2008 | A | PASS |
Troy Cobbley
|
|
|
The inspection today was just for the armovers/hangers. No T-bar has been installed and the flex heads have not been installed into the grid.
|
Override - Parcel Holds | 4/18/2008 | 1/1/1900 | 4/18/2008 | | |
|
|
|
fire inspection
|
Sprinkler Plan Check | 3/18/2008 | | 3/19/2008 | | PASS |
|
|
|
quick permit done by brian Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 3/19/2008 | | 3/19/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 3/19/2008 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/19/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/19/2008 | | DONE |
|
|
|
|
Application received | | | 3/18/2008 | | |
|
|
|
|
Pending Assignment by SAM | 3/18/2008 | | | | |
|
|
|
|