Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR08-00212
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 213 N 9TH ST
Project NameSEDGWICK CENTER-1ST FLR
Customer Number 
ePlanReview 
Description
Work Scope: OH / High Pressure System
(D. L. EVANS BRANCH BANK - SEDGWICK CENTER - 1ST STORY) (CZC08-00010) This building is fire sprinklered to comply with high-rise provisions. To construct a bank within an existing 4,590 square foot tenant space located on the 1st story of a high-rise building. Work is to include interior nonbearing walls, interior doors, interior windows, a night deposit box, an ATM, suspended gypsum board ceiling, suspended acoustical ceilings, gypsum board soffits, millwork, an exterior window, an exterior metal window panel, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department.
OH Scope: The Fire Sprinkler scope consists modifying the existing shell protection by adding 41 down heads to accommodate a new wall lay out. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-00254.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/3/20086/4/20086/4/2008PPASS
DetailsForrest France
Fire sprinkler permit work passed final inspection.
INSP-Sprinkler Rough-in5/15/20085/16/20085/16/2008PPASS
DetailsTroy Cobbley
The sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro5/8/20085/9/20085/9/2008AFAIL
DetailsTroy Cobbley
The approved plans that were on site the last inspection have disapeared. I let the fire sprinkler contractor know where to get copies. I went over the previous deficiencies with him. No new inspection was performed.
INSP-Sprinkler Rough-in/Hydro5/5/20085/6/20085/6/2008APART
DetailsTroy Cobbley
See the city approved plans for rooms marked in red with "OK" that can have the piping covered. The rooms with out the "OK" either had defieciencies or did not have completed work and can not be covered. No sprinkler contractor was on site.
PLANS/APPL TAKEN TO FRONT DESK  4/23/2008  
DetailsCathy Brown
Inspection Record Card- Fire4/23/2008 4/23/2008 DONE
DetailsCathy Brown
Telephone call  4/23/2008 DONE
DetailsCathy Brown
tlk to donald curtis ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  4/23/2008  
DetailsCathy Brown
Issue permit  4/23/2008 DONE
Plan assigned to (OutSourced)4/15/2008 4/22/2008 PASS
Details
Plans are approved by Bryan Johnson
Plan resubmittals received  4/15/2008 DONE
received 1 Fire Permit Application, 1 fire cover sheet,1 review comment,3 product data sheets and 3 copies of sheet FP1.OF 1
sent to fire
Early Start  4/14/2008 DONE
see attached documents.
Plan assigned to (SAM)3/18/2008 4/9/2008 PASS
DetailsKenneth R Roule
4/9/2008 14:06:47 KRR - activity updated through activity FIRA22 from case FIR08-00258.
Sprinkler Plan Check3/18/2008 4/8/2008 FAIL
Details
These plans were denied due to missing or lacking information. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set will be maintained for 5 working days.
Application received  3/18/2008  
Pending Assignment by SAM3/18/2008