INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PASS |
Forrest France
|
|
|
Corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 5/13/2008 | 5/15/2008 | 5/15/2008 | A | PART |
Forrest France
|
|
|
Relocate supply for one head piped below equipment obstructions per plan, attatch missing retaining strap at one main hanger-see plan annotations.
|
Issue and Print Permit | | | 4/24/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 4/10/2008 | | PASS |
|
|
|
Onsite review - approved by T. cobbley.
|
Plan assigned to (Scott) | | | 4/2/2008 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 4/2/2008 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (Troy) | 4/23/2008 | | | | |
|
|
|
|