INSP-Final Inspection | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 10/13/2008 | 10/14/2008 | 10/13/2008 | A | CANC |
Forrest France
|
|
|
Richard Clark is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Conference | 10/7/2008 | 10/8/2008 | 10/8/2008 | P | DONE |
Forrest France
|
|
|
Conference regarding attatched outside storage area. See NFPA 13 2007 8.15.7.5 regarding coverage at areas below exterior canopies.
|
INSP-Conference | 10/7/2008 | 10/8/2008 | 10/7/2008 | P | CANC |
Forrest France
|
|
|
Mike Bierman is the contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Forrest France
|
|
|
Under ground hydro passed. KR
|
INSP-Supply line flush | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed.
|
INSP-Sprinkler Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | DEFR |
Forrest France
|
|
|
Duplicate inspection request.
|
INSP-Supply line flush | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | CANC |
Troy Cobbley
|
|
|
Need to cancel per Josh Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line is approved for cover from the PIV to the ductile riser stub.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2008 | | |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 4/30/2008 | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
tlk to lillie of shilo ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 4/30/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/18/2008 | | 4/27/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 4/18/2008 | | |
|
|
|
|
Case Summary | | | 4/18/2008 | | DONE |
|
|
|
|
Case Summary | | | 4/18/2008 | | DONE |
|
|
|
|
Pending Assignment by SAM | 4/18/2008 | | | | |
|
|
|
|