INSP-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/31/2008 | 8/1/2008 | 8/1/2008 | A | FAIL |
Troy Cobbley
|
|
|
Still need the upright head added at the pizza area as discussed.
|
INSP-Final Inspection | 6/12/2008 | 6/13/2008 | 6/13/2008 | P | PART |
Troy Cobbley
|
|
|
See the approved plans for piping at the pizza place that can be covered. I let Rick know that one additional upright will be required in the combustible space. I will verify this upright at the next inspection.
|
Plan assigned to (SAM) | 4/23/2008 | | 5/13/2008 | | PASS |
Cathy Brown
|
|
|
5/13/2008 10:16:35 CMB - activity updated through activity FIRA22 from case FIR08-00290.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 5/13/2008 | | 5/13/2008 | | |
Cathy Brown
|
|
|
|
Telephone call | | | 5/13/2008 | | DONE |
Cathy Brown
|
|
|
tlk to eddy nelson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/13/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 5/13/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/23/2008 | | 5/9/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 4/23/2008 | | |
|
|
|
|
Pending Assignment by SAM | 4/23/2008 | | | | |
|
|
|
|