INSP-Final Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | CANC |
Troy Cobbley
|
|
|
Stan Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2008 | 9/10/2008 | 9/12/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed. Ryan asked me to look at the earthquake bracing for the overhead system while I was there. The attachment point on the webbing of the trusses is not allowed unless a structural engineer approves it. If not the attachment point is to be at the top of the structure.
|
INSP-Supply line flush | 8/27/2008 | 8/29/2008 | 8/29/2008 | P | CANC |
Troy Cobbley
|
|
|
This is an ug flush. They are having a bbq that day and need the flush to be from 3:00-3:30. Ryan is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to bury.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/30/2008 | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
tlk to lillie that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 4/30/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/23/2008 | | 4/27/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 4/23/2008 | | |
|
|
|
|
Pending Assignment by SAM | 4/23/2008 | | | | |
|
|
|
|