INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Forrest France
|
|
|
Correction notice items have been repaired, two missing 401 canopies installed while on site, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | FAIL |
Forrest France
|
|
|
See annotations on plan set for items in need of correction including spacing at pendent heads in the womens restroom, one painted head above the stairs 2nd floor, spacing at two heads adjacent to the elevator lobby, noted two heads at the first floor with excessive loading. Relocated heads at the kitchen area are okay for cover.
|
Override - Parcel Holds | | | 5/21/2008 | | |
|
|
|
|
Issue permit | | | 5/21/2008 | | DONE |
|
|
|
|
Plan assigned to (OutSourced) | 4/30/2008 | | 5/20/2008 | | PASS |
Sam Rogers
|
|
|
5/20/2008 14:21:41 CMB - activity updated through activity FIRA22 from case FIR08-00309.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2008 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/20/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 4/30/2008 | | 5/20/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 5/20/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with greg johnson ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 5/20/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 5/20/2008 | | DONE |
Cathy Brown
|
|
|
|
Sprinkler Plan Check | 4/30/2008 | | 5/19/2008 | | PASS |
|
|
|
Plans & Calculations are approved by Bryan Johnson
|
Application received | | | 4/30/2008 | | |
|
|
|
|
Case Summary | | | 4/30/2008 | | DONE |
|
|
|
|
Pending Assignment by SAM | 4/30/2008 | | | | |
|
|
|
|