Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final.
|
INSP-Final Inspection | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2008 | 10/22/2008 | 10/23/2008 | P | PART |
Forrest France
|
|
|
Rough-in okayed for cover.
|
INSP-Sprinkler Rough-in | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PART |
Forrest France
|
|
|
The remainder of OH fire sprinkler work at the 2nd floor tenant remodel is okay for cover.
|
INSP-Sprinkler Rough-in | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover except the piping in the north side high area. This piping needs to have a re-inspection when the batt insulation is installed.
|
INSP-Sprinkler Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | NR |
Forrest France
|
|
|
mike Phone #: ###-####
|
Override - Parcel Holds | 6/23/2008 | 1/1/1900 | 6/23/2008 | | |
|
|
|
not bldg just for fire
|
Issue and Print Permit | | | 5/30/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/8/2008 | | 5/27/2008 | | PASS |
Patricia Smith
|
|
|
5/27/2008 11:51:29 P_S - activity updated through activity FIRA22 from case FIR08-00328.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/27/2008 | | 5/27/2008 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 5/27/2008 | | DONE |
|
|
|
left message w sam for greg johnson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/27/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/8/2008 | | 5/22/2008 | | PASS |
|
|
|
plans are approved
|
Application received | | | 5/8/2008 | | |
|
|
|
|
Pending Assignment by SAM | 5/8/2008 | | | | |
|
|
|
|