INSP-Final Inspection | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 11/18/2008 | 11/18/2008 | 11/18/2008 | P | DONE |
Forrest France
|
|
|
Underground flush completed.KR
|
INSP-Supply line flush | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | NR |
Forrest France
|
|
|
Water supply not available at the time of inspection, to be rescheduled as discussed.
|
INSP-Sprinkler Rough-in | 10/15/2008 | 10/20/2008 | 10/15/2008 | A | CANC |
Troy Cobbley
|
|
|
Charles Lamb is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in | 9/4/2008 | 9/5/2008 | 9/5/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 6/11/2008 | 6/12/2008 | 6/13/2008 | A | PART |
Troy Cobbley
|
|
|
The stub out from the building to 10' out is ok to cover. Piping as installed is 6" and matches what is shown on the plans.
|
Issue and Print Permit | | | 5/29/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/8/2008 | | 5/27/2008 | | PASS |
Cathy Brown
|
|
|
5/27/2008 12:48:05 CMB - activity updated through activity FIRA22 from case FIR08-00331.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
tlk to lilly that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 5/27/2008 | | 5/27/2008 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 5/27/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/8/2008 | | 5/22/2008 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 5/8/2008 | | |
|
|
|
|
Pending Assignment by SAM | 5/8/2008 | | | | |
|
|
|
|